# | Name of the work |
District |
Work Order |
Physical Progress in percentage(%) |
Administrative Approval No. |
Administrative Approval Date |
Administrative Approval Amount(Rs) |
Contractor Name | Contract Amount(Rs) | Date of completion
as per work order |
Status | Photos | Remarks | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Construction of District Hospital at Hojai in Hojai District under NHM, Assam | Hojai | 22-10-2018 | 27,36,79,400.00 |
|
-- | In progress |
|
|||||||
2 | Construction of MNCU at Barpeta Civil Hospital in Kalgachia in Barpeta District under NHM, Assam | Barpeta | Work Order | NHM/C-CW/Kalgachia DH/1462/12/119 | 21-06-2019 | 91,82,668.00 |
|
30-05-2020 | Completed |
|
|||||
3 | Upgradation of existing Hatsingimari SDCH to District Hospital in South Salmara District under NHM | Dhubri | NHM/CHC/2-16-17/3233/16/pt/122 | 28-09-2018 | 21,82,60,460.00 |
|
-- | In progress |
|
||||||
4 | Upgradation of existing Sonari SDCH to District Hospital in Charaideo District under NHM | Sivasagar | NHM/CHC/2016-17/3233/16/pt/128 | 22-10-2018 | 18,09,40,070.00 | -- | Allotted |
|
|||||||
5 | Construction of 100 beded hospital at garmur majuli | Jorhat | -- | 0.00 | -- | Allotted |
|
||||||||
6 | Construction of District Hospital at Garmur in Majuli District under NHM, Assam | Majuli | -- | 22,38,25,300.00 |
|
-- | In progress |
|
|||||||
7 | Construction of District Hospital at Garmur in Majuli District under NHM, Assam | Majuli | -- | 22,38,25,300.00 |
|
-- | In progress |
|
|||||||
8 | Construction of District Hospital at Garmur in Majuli District under NHM, Assam | Majuli | -- | 22,38,25,300.00 |
|
-- | In progress |
|
|||||||
9 | Upgradation of existing Hamren SDCH to District Hospital in Karbi Anglong District under NHM on Turn Key Basis | Karbi Anglong | -- | 29,64,64,400.00 |
|
-- | In progress |
|
|||||||
10 | Upgradation of existing Hamren SDCH to District Hospital in Karbi Anglong District under NHM on Turn Key Basis | Karbi Anglong | -- | 29,64,64,400.00 |
|
-- | In progress |
|
|||||||
11 | Upgradation of existing Hamren SDCH to District Hospital in Karbi Anglong District under NHM on Turn Key Basis | Karbi Anglong | -- | 29,64,64,400.00 |
|
-- | In progress |
|
|||||||
12 | Upgradation of existing Biswanath Chariali SDCH to 200 bedded District Hospital in Biswanath District under NHM on Turn Key basis | Sonitpur | 70 | -- | 20,81,39,800.00 |
|
-- | In progress | Photos |
Work is in progress. |
|||||
13 | Upgradation of existing Sonari SDCH to District Hospital in Charaideo under NHM, Assam | Sivasagar | -- | 18,09,40,070.00 |
|
-- | In progress |
|
|||||||
14 | upgradation of existing Hatsingimari SDCH to District Hospital in South Salmara District under NHM, Assam on Turn Key basis | South Salmara | Work Order | NHM/CHC/2-16-17/3233/16/Pt/122 | 28-09-2018 | 21,82,60,460.00 |
|
06-05-2021 | Completed |
|
|||||
15 | Upgradation of existing KSHS SDCH at Ligiriphukhuri in Sivasagar District under NHM, Assam on Turnkey Basis. | Sivasagar | Work Order | NHM-32042/6/2020-Construction-NHM/61 | 25-02-2021 | 16,59,00,000.00 | 24-10-2023 |
|
|||||||
16 | CONSTRUCTION OF 6 BEDDED INTENSIVE CARE UNIT (ICU) AT GOALPARA CIVIL HOSPITAL IN GOALPARA DISTRICT UNDER NHM, ASSAM ON TURN KEY BASIS | Goalpara | -- | 0.00 | 18-06-2017 | Handed Over | Photos |
|
|||||||
17 | Construction of MCH wing with residential accommodation for staffs at SKK civil Hospital, Golaghat | Golaghat | 95 | -- | 0.00 | -- | In progress | Photos |
Main hospital building is ready for Covid-19 patiet. Lift, a part of boundary wall, residential quarters work remain. |
||||||
18 | Construction of 100 bedded MCH Wing with accommodation for staffs at Kanaklata CH [Poruwa] in Sonitpur District under NRHM on Turn Key Basis | Sonitpur | Work Order | 100 | NRHM/C-CW/MCH/Kanaklata CH/1672/13/1695 | 19-04-2013 | 21,85,91,000.00 |
|
31-05-2018 | In progress | Photos |
Work has been completed and functioning as COVID-19 Care Centre. |
|||
19 | Construction of 100 Bedded MCH Wing with accomodation for staffs at existing Morigaon CH under NRHM | Morigaon | Work Order | 52 | NRHM/C-CW/MCH/Morigaon/1779/13/12515 | 02-07-2013 | 22,53,67,000.00 |
|
-- | In progress | Photos |
Tiles fitting work in progress with very few manpower. Physical progress is very negligible since last 30 months.No progress at Residential Quarters. |
|||
20 | Construction of 100 beded MCH wing at Mangaldoi CH | Darrang | No.NRHM/C-CW/MCH/Mangaldoi/1518/12/7240 | 22-01-2013 | 2,29,00,000.00 |
|
-- | In progress |
|
||||||
21 | Construction of 100 beded MCH wing at Dhemaji Civil Hospital, Dhemaji | Dhemaji | -- | 0.00 | -- | Completed |
|
||||||||
22 | Construction of 100 beded MCH wing at Karimganj CH | Karimganj | No.NRHM/C-CW/MCH/Karimganj/1510/12/1680 | 19-04-2016 | 0.00 | -- | Handed Over |
|
|||||||
23 | Construction of 100 beded MCH wing at BP CH, Nagaon (Mahkhuli) | Nagaon | -- | 0.00 | -- | Handed Over | Photos |
|
|||||||
24 | Construction of 100 beded MCH wing of Jorhat CH (JMCH) | Jorhat | -- | 0.00 | -- | Handed Over |
|
||||||||
25 | Construction of 100 beded MCH wing at Kanaklata CH, Sonitpur (Paruwa) | Sonitpur | -- | 0.00 | -- | In progress |
|
||||||||
26 | Construction of 100 beded MCH wing with quarters of Lakhimpur CH | Lakhimpur | NRHM/C-CW/MCH/North Lakhimpur/1781/13/12638 | 02-07-2013 | 22,34,15,000.00 | -- | In progress |
|
|||||||
27 | Construction of 100 beded MCH wing with quarters at exixting Kokrajhar Civil hospital(C.H.) under NHM | Kokrajhar | 60 | -- | 0.00 | -- | In progress | Photos |
1. RCC work up to third slab completed. RCC work in column from third slab is in progress. 2. Brick work in ground floor completed. Brick work in first floor & second floor is in progress. 3. RCC work in column up to post plate beam level completed. Bar |
||||||
28 | Construction of 100 bedded Maternity Child Health Wing with accommodation for staffs at existing Sivasagar Civil Hospital, Sivasagar under NRHM | Sivasagar | 17 | -- | 0.00 |
|
-- | In progress | Photos |
Shuttering of Grade beam in progress R/F binding of column in progress |
|||||
29 | Construction of 100 bedded Maternity Child Health wing with accommodation for staff at SMK Civil Hospital, Nalbari under NRHM on turnkey basis | Nalbari | -- | 0.00 | -- | Handed Over | Photos |
|
|||||||
30 | 100 bedded MCH Wing including residential quarters for staffs at LGB Civil Hospital, Tinsukia under NHM | Tinsukia | -- | 0.00 | -- | Handed Over | Photos |
|
|||||||
31 | Construction of 100 Bedded Maternity Child Health Wing with Quarters at Dhubri Civil Hospital,Dhubri under NHM,Assam | Dhubri | 6 | -- | 0.00 |
|
-- | In progress | Photos |
|
|||||
32 | Up-gradation of existing Sadiya BPHC to SDCH in Tinsukia Dist under NHM | Tinsukia | 70 | 00-00-0000 | 2,043.92 |
|
23-10-2020 | Handed Over | Photos |
Progress of work is satisfactory |
|||||
33 | Upgradation of existing Bokakhat SDCH in Golaghat District | Golaghat | 100 | NHM/CHC/2016-17/3233/16/pt/145 | 22-10-2018 | 12,05,68,900.00 |
|
-- | Handed Over | Photos |
Work completed and handed over. |
||||
34 | Upgradation of Existing Mukalmua FRU to SDCH in Nalbari Dist under NHM | Nalbari | 25 | 00-00-0000 | 1,471.41 |
|
-- | In progress |
|
||||||
35 | Up gradation of Existing Lakhipur BPHC to SDCH to Goalpara District | Goalpara | NHM/CHC/2-16-17/3233/16/pt/135 | 22-10-2018 | 11,39,03,300.00 |
|
-- | Handed Over |
|
||||||
36 | Strengthening of Titabor SDCH in Jorhat District under NHM,Assam on Turn key Basis. | Jorhat | Work Order | 14 | -- | 0.00 |
|
-- | In progress | Photos |
|
||||
37 | Upgradation of existing Jakhalabandha FRU to SDCH in Nagaon Dist. under NHM | Nagaon | 100 | 00-00-0000 | 1,625.08 | -- | Completed | Photos |
|
||||||
38 | Upgradation of existing Sorbhog CHC to SDCH in Barpeta Dist under NHM | Barpeta | 74 | -- | 15,19,20,000.00 |
|
-- | In progress | Photos |
Work in progress |
|||||
39 | Upgradation of Gohpur FRU to SDCH in Biswanath District | Biswanath | -- | 18,10,16,000.00 |
|
-- | Handed Over |
|
|||||||
40 | Up gradation of 100 bedded RNB Gossaigaon SDCH in Kokrajhar District | Kokrajhar | 99 | -- | 23,15,48,900.00 |
|
-- | In progress | Photos |
All works completed. The deep boring & water pump is excluded from the scope of the work by MD, NHM. The handing over process was hampered as the authority denied to taking over the project without running water facility. Suggestion/Intervention needed f |
|||||
41 | Upgradation of Bhetagaon CHC to Bijni SDCH in Chirang District | Chirang | 100 | -- | 16,37,33,000.00 |
|
-- | In progress | Photos |
Work completed.Handing Over & Taking Over is completed. |
|||||
42 | Upgradation of existing jonai BPHC to SDCH in Dhemaji District under NHM | Dhemaji | 76 | -- | 21,00,36,300.00 |
|
-- | In progress |
Work in progress.(Extension applied for upto 31/12/2022) |
||||||
43 | Upgradation of Lumding FRU to 100 bedded Hospital in Hojai Dist under NHM | Hojai | -- | 19,26,82,500.00 |
|
-- | In progress |
|
|||||||
44 | Upgradation of Pathsala SDCH in Barpeta District under NHM | Barpeta | 74 | -- | 16,37,33,000.00 |
|
-- | Photos |
Work in progress. |
||||||
45 | Upgradation of existing Tamulpur SDCH in Baksa Dist under NHM | Baksa | -- | 16,59,58,100.00 | -- | In progress |
|
||||||||
46 | Up-gradation of existing Dhakuakhana SDCH in Lakhimpur District under NHM, Assam on Turnkey Basis | Lakhimpur | Work Order | -- | 0.00 | 06-08-2024 |
|
||||||||
47 | Up-gradation of existing Sarupathar CHC to SDCH in Golaghat District under NHM, Assam on Turnkey Basis | Golaghat | Work Order | 30 | -- | 0.00 |
|
30-03-2024 | In progress | Photos |
Work is in progress. |
||||
48 | Renovation of existing BPHC Main Building (New) at Putia, Sisiborgaon in Dhemaji District under NHM Assam | Dhemaji | Work Order | 38 | NHM-32049/1/2020-Construction-NHM/64 | 07-12-2020 | 1,05,97,171.00 | 02-01-2023 | Photos |
Work in progress. |
|||||
49 | Construction of Community Health Centre including residential quarters(Phase I) at Fakirganj in Dhubri District(Balance Work) under NHM | Dhubri | 85 | -- | 0.00 |
|
-- | In progress | Photos |
|
|||||
50 | Construction of community Health Centre (Model Hospital)including resdential quarters at Karigaon in Kokrajhar District. | Kokrajhar | 100 | -- | 0.00 |
|
-- | Allotted | Photos |
Defects Liability period was over in the year 2021. |
|||||
51 | Construction of Community Health Centre (Model Hospital) includes residential quarter at Dagaon BPHC in Nagaon District un | Nagaon | 98 | -- | 0.00 | -- | In progress |
Construction of Main Hospital Building including Quarters work completed . Site development work in progress |
|||||||
52 | Construction of CHC( Model Hospital) | Kokrajhar | 100 | NO.NRHM/C-CW/CHC/Sefanguri/Kokrajhar/2392/14/47332 | 29-05-2015 | 5,05,00,000.00 |
|
-- | In progress | Photos |
Handed Over to the Authority. |
||||
53 | Construction of CHC( Model Hospital) | Nagaon | 90 | No.NHM/C-CW/CHC/Simonabasti/Nagaon/767-31 | 27-09-2016 | 5,05,00,000.00 |
|
-- | In progress | Photos |
|
||||
54 | Construction of CHC( Model Hospital) | Kamrup Metro | -- | 0.00 | -- |
|
|||||||||
55 | Construction of CHC( Model Hospital) Balance work | Nagaon | -- | 0.00 | -- | Completed | Photos |
|
|||||||
56 | Construction of CHC( Model Hospital) | Hailakandi | 100 | -- | 0.00 | -- | Allotted |
Completed and Handed over and Functioning. |
|||||||
57 | Construction of CHC (Model Hospital) [Phase-1] at Tikal in Cachar District | Cachar | Work Order | NRHM/C-CW/CHC/Tikal/Cachar/774/10/1867 | 29-09-2010 | 4,00,00,000.00 | 30-09-2013 | Handed Over |
|
||||||
58 | Construction of CHC(Model Hospital) including residential quarters [Phase-I] at Kalabari PHC in Sonitpur District | Sonitpur | 30-07-2010 | 4,16,48,197.00 |
|
27-11-2013 | Handed Over |
|
|||||||
59 | Construction of Community Health Centre [Model Hospital] including residential quarters at Khatikuchi in Nalbari District | Nalbari | -- | 0.00 |
|
10-04-2015 | Handed Over |
|
|||||||
60 | Construction of 30 bedded Community Health Centre including Quarters at Sootea under Sootea LAC in Biswanath district. | Biswanath | 95 | -- | 0.00 | 20-05-2021 |
Work is in progress. |
||||||||
61 | Construction of CHC( Model Hospital) in Kheroni | Karbi Anglong | 100 | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/5673 | 11-12-2012 | 4,90,33,000.00 |
|
04-08-2016 | Completed | Photos |
|
||||
62 | Construction of Community Health Centre [Model Hospital] including residential quarters at Mandia in Barpeta District under NRHM on Turn Key Basis | Barpeta | -- | 0.00 | -- | Handed Over |
|
||||||||
63 | Construction of CHC( Model Hospital) in Girishganj in Karimganj District | Karimganj | -- | 0.00 | -- | Handed Over |
|
||||||||
64 | Construction of Community Health Centre[Model Hospital] including residential quarters at Bhaktardoba in Barpeta District under NRHM on Turn Key Basis | Barpeta | -- | 0.00 | -- | Handed Over |
|
||||||||
65 | Construction of CHC( Model Hospital) at Barama | Baksa | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/6886 | 03-01-2013 | 4,40,44,000.00 |
|
-- | Handed Over | Photos |
|
|||||
66 | Construction of CHC( Model Hospital) in Kachuadam in Karimganj District | Karimganj | 12-12-2012 | 5,04,73,000.00 | -- | Handed Over |
|
||||||||
67 | Construction of CHC( Model Hospital) at Bhalukaduba | Barpeta | NRHM/C-CW/CHC/Model/Bhalukdoba/Barpeta/1950/13/23178 | 12-11-2013 | 1.00 |
|
04-02-2015 | Handed Over |
|
||||||
68 | Construction of CHC( Model Hospital) of Majgaon | Barpeta | NRHM/C-CW/CHC/Majgaon/Barpeta/1951/13/22707 | 24-10-2013 | 0.00 |
|
-- | Handed Over |
|
||||||
69 | Construction of CHC( Model Hospital) of Palongghat | Cachar | NRHM/C-CW/CHC/Polongghat/Cacher /1996/13/33093 | 15-05-2014 | 5,04,50,000.00 |
|
-- | Handed Over | Photos |
|
|||||
70 | Construction of Community Health Centre [Model Hospital ] including residential quarters at Dekargaon in Sonitpur District(Balance Work) under NHM | Sonitpur | 92 | -- | 0.00 |
|
31-07-2018 | In progress | Photos |
Progress of the work is very slow. |
|||||
71 | Construction of CHC( Model Hospital) at Kachudaram | Cachar | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/17302 | 30-03-2013 | 0.00 |
|
15-09-2016 | Handed Over |
|
||||||
72 | Construction of CHC (Model Hospital) i/c residential quarters at Dimakuchi in Udalguri Dist. under NHM | Udalguri | 100 | NHM/C-CW/CHC(2016-17)/3233/16/Pt/169 | 22-10-2018 | 6,74,03,800.00 |
|
-- | Handed Over | Photos |
|
||||
73 | Construction of CHC( Model Hospital) at Kashikotra | Chirang | NRHM/C-CW/CHC/Kashikotra/Chirang/1952/13/22737 | 24-10-2013 | 0.00 |
|
-- | In progress | Photos |
|
|||||
74 | Construction of CHC( Model Hospital) in Bijni (Panbari SD) in Chirang District | Chirang | NRHM/C-CW/CHC/Model/Bijni/Chirang/2119/30094 | 19-02-2014 | 5,04,71,000.00 |
|
-- | Allotted |
|
||||||
75 | Construction of CHC( Model Hospital) at Junaram Chowka | Darrang | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/5673 | 11-12-2012 | 1.00 |
|
-- | Completed |
|
||||||
76 | Construction of CHC( Model Hospital) in Telahi at Lakhimpur District | Lakhimpur | -- | 0.00 | -- | In progress |
|
||||||||
77 | Construction of CHC( Model Hospital) at Machkhowa (Sissimukh MPHC) | Dhemaji | NRHM/C-CW/CHC/Machkhowa/Model Hospital/Dhemaji/2121/14/33244 | 17-05-2014 | 5,05,00,000.00 | -- | In progress |
|
|||||||
78 | Construction of CHC( Model Hospital) in Bhurbandha at Morigaon District | Morigaon | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/5673 | 11-12-2012 | 4,90,33,000.00 | 01-10-2015 | In progress | Photos |
|
||||||
79 | Construction of CHC( Model Hospital) at Sukchar | Dhubri | NRHM/C-CW/CHC/Langkashi/Tinisukia/1676/13/456 | 04-04-2013 | 100.00 | -- | In progress |
|
|||||||
80 | Construction of CHC( Model Hospital) at Kismat Hasdaha (Kalahat) | Dhubri | 95 | NRHM/C-CW/CHC/Kismat Hajda/Dhubri/2091/14/28126 | 27-01-2014 | 5,05,00,000.00 |
|
-- | In progress | Photos |
|
||||
81 | Construction of CHC( Model Hospital) at Jokai | Dibrugarh | -- | 0.00 | -- | In progress | Photos |
|
|||||||
82 | Construction of CHC( Model Hospital) at Lengeri | Dibrugarh | -- | 0.00 | -- | Handed Over | Photos |
|
|||||||
83 | Construction of CHC( Model Hospital) at Langting | Dima Hasao | NRHM/C-CW/CHC/Langting/Dima Hasao/1998/13/25307 | 30-11-2013 | 5,18,05,000.00 | -- | In progress | Photos |
|
||||||
84 | Construction of CHC( Model Hospital) at Jaleswar | Goalpara | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/6886 | 03-01-2013 | 0.00 |
|
20-07-2017 | Handed Over | Photos |
|
|||||
85 | Construction of CHC( Model Hospital) at Matia | Goalpara | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/6886 | 03-01-2013 | 0.00 |
|
-- | Handed Over |
|
||||||
86 | Construction of CHC( Model Hospital) at Khumtai | Golaghat | 100 | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/5673 | 11-12-2012 | 0.00 |
|
20-04-2015 | Completed |
|
|||||
87 | Construction of CHC( Model Hospital) at Uriamghat | Golaghat | 100 | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/6886 | 03-01-2013 | 0.00 |
|
-- | In progress |
Uriamghat model hospital inaugurated on 13/06/2019. |
|||||
88 | Construction of CHC( Model Hospital) at Kachamari | Golaghat | 100 | NRHM/C-CW/CHC/Kachamari/Golaghat/2085/13/29827 | 12-12-2014 | 5,05,00,000.00 |
|
-- | In progress |
|
|||||
89 | Construction of CHC( Model Hospital) at Kachamari PHC | Golaghat | 100 | NRHM/C-CW/CHC/Kachamari/Golaghat/2085/13/29827 | 12-02-2014 | 5,05,00,000.00 | -- | In progress |
|
||||||
90 | Construction of CHC( Model Hospital) at Algapur | Hailakandi | NRHM/C-CW/CHC/Algapur/Hailakandi/2003/13/25358 | 30-11-2013 | 0.00 | -- | Handed Over |
|
|||||||
91 | Construction of CHC( Model Hospital) at Nahar Donga Grant | Golaghat | 100 | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/5673 | 11-12-2012 | 0.00 |
|
-- | Completed |
|
|||||
92 | Construction of CHC( Model Hospital) in Odali at Nagaon District | Nagaon | 100 | -- | 0.00 | -- | Handed Over | Photos |
|
||||||
93 | Construction of CHC( Model Hospital) in Uzuragaon at Nagaon District | Nagaon | 100 | -- | 0.00 | -- | Completed |
|
|||||||
94 | Construction of CHC( Model Hospital)at Nabera | Jorhat | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/17302 | 30-03-2013 | 0.00 |
|
-- | Handed Over |
|
||||||
95 | Construction of CHC( Model Hospital) at Chungi Kahargaon | Jorhat | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/6886 | 03-01-2013 | 1.00 |
|
-- | Handed Over |
|
||||||
96 | Construction of CHC( Model Hospital) at Jengraimukh PHC | Jorhat | 100 | NRHM/C-CW/CHC/Jengraimukh/Jorhat/1988/13/22669 | 24-10-2013 | 5,03,82,000.00 |
|
-- | In progress | Photos |
External Electrification works in progress. Electrical works progress= 90% |
||||
97 | Construction of CHC( Model Hospital) including residential quarter at Singimari in Kamrup (R) District under NRHM on Turn Key Basis | Kamrup Rural | 99 | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/10844 | 18-03-2013 | 4,97,18,000.00 |
|
-- | In progress | Photos |
|
||||
98 | Construction of CHC( Model Hospital) at Kalitakuchi | Kamrup Rural | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/6886 | 03-01-2013 | 4,40,44,000.00 |
|
27-01-2015 | Handed Over |
|
||||||
99 | Construction of CHC( Model Hospital) including residential quarters at Rangia in Kamrup (R ) District under NRHM on Turn Key basis | Kamrup Rural | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12 | 01-06-2013 | 5,56,73,000.00 |
|
31-10-2015 | Handed Over |
|
||||||
100 | Construction of CHC( Model Hospital) at Mainakhorong in Kamrup (R) District under NRHM on Turn Key Basis | Kamrup Rural | 100 | NRHM/C-CW/CHC(Model Hospital)/2012-13/1445/12/Pt/22682 | 24-10-2010 | 4,64,43,000.00 | 08-03-2017 | Handed Over |
work completed and functioning. |
||||||
101 | Construction of CHC( Model Hospital) in Khatikuchi in Nalbari District | Nalbari | -- | 0.00 | -- | Completed | Photos |
|
|||||||
102 | Construction of CHC( Model Hospital) in Sapekhati in Sivsagar District | Sivasagar | -- | 0.00 | -- | Completed |
|
||||||||
103 | Construction of CHC( Model Hospital) in Tihu at Nalbari District | Nalbari | -- | 0.00 | -- | Completed |
|
||||||||
104 | Construction of Community Health Centre [ Model Hospital] including residential Quarters at Borcholla in Sonitpur District under NRHM Assam. | Sonitpur | 89 | -- | 0.00 | 31-08-2018 | In progress | Photos |
Work is in progress.Tentative Date of Completion is 31/01/2023. As of now, Main Hospital Building is 93% completed and finishing of Tiles, Fitting & fixing of Doors and finishing of Painting etc. are in progress. |
||||||
105 | Construction of CHC( Model Hospital) in Dekargaon at Sonitpur District | Sonitpur | NRHM/C-CW/CHC/Dekargaon/Sonitpur/1975/13 | 01-10-2013 | 4,93,99,000.00 |
|
-- | In progress |
|
||||||
106 | Construction of CHC( Model Hospital) in Mahkhuli near Itakhuli at Tinsukia District | Tinsukia | 100 | -- | 0.00 | -- | Handed Over | Photos |
Work completed and functioning |
||||||
107 | Construction of CHC( Model Hospital) in Gumtibil at Tinsukia District | Tinsukia | -- | 0.00 | -- | In progress |
|
||||||||
108 | Construction of CHC( Model Hospital) in Gumtibil at Tinsukia District | Tinsukia | 100 | -- | 0.00 | -- | In progress | Photos |
Work completed handing over in process. |
||||||
109 | Construction of Community Health Centre[Model Hospital] including residential quarters[Phase-I] at Lahorighat PHC in Morigaon District under NRHM | Morigaon | -- | 0.00 | 02-12-2015 | Handed Over | Photos |
|
|||||||
110 | Construction of CHC( Model Hospital) in Bogapani, Digboi in Tinsukia District | Tinsukia | -- | 0.00 | -- |
|
|||||||||
111 | Construction of Community Health Centre [Model hospital including residential quarters [phase-ll at Nakhola SD in Morigaon | Morigaon | -- | 0.00 | 16-05-2012 | Handed Over | Photos |
|
|||||||
112 | Construction of CHC( Model Hospital) in no.1 Kalaigaon at Udalguri District | Udalguri | -- | 0.00 | -- | Handed Over |
|
||||||||
113 | Construction of CHC( Model Hospital) in Harisinga SD at Udalguri District | Udalguri | -- | 0.00 | 25-06-2017 | Handed Over |
|
||||||||
114 | Construction of CHC( Model Hospital) in Nagrijuli at Baksa District | Baksa | 100 | -- | 0.00 | -- | In progress | Photos |
All completed and functioning |
||||||
115 | Construction of CHC( Model Hospital) in Srijangram at Bongaigaon District | Bongaigaon | 80 | NO.NRHM/C-CW/CHC/Srijangram/Bongaigaon/2650/15/51481 | 25-08-2015 | 5,05,00,000.00 |
|
-- | In progress | Photos |
progress is slow. |
||||
116 | Construction of CHC(Model Hospital) including residential quarter at Malinibeel area of Silchar town in cachar District under NHM,Assam, | Cachar | 22-10-2018 | 6,96,38,800.00 |
|
-- | Allotted |
|
|||||||
117 | construction of CHC(Model hospital) including residential quarter at mahilipara in Udalguri District under NHM | Udalguri | 100 | 22-10-2018 | 6,69,62,600.00 | -- | Handed Over | Photos |
|
||||||
118 | construction of CHC(Model hospital) including residential quarter at Nasatra in Barpeta District under NHM | Barpeta | 09-11-2019 | 7,18,03,735.00 |
|
-- | In progress |
|
|||||||
119 | construction of CHC(Model hospital) including residential quarter at Nasatra in Barpeta District under NHM | Barpeta | 09-11-2019 | 7,18,03,735.00 |
|
-- | In progress |
|
|||||||
120 | Construction of CHC(Model hospital) including residential quarter at Nasatra in Barpeta District under NHM | Barpeta | 100 | 09-11-2019 | 7,18,03,735.00 |
|
-- | In progress | Photos |
Work completed. Handing over is in process. |
|||||
121 | construction of CHC(Model hospital) including residential quarter at Nasatra in Barpeta District under NHM | Barpeta | 09-11-2019 | 7,18,03,735.00 |
|
-- | Allotted |
|
|||||||
122 | construction of CHC(Model hospital) including residential quarter at Nasatra in Barpeta District under NHM | Barpeta | 09-11-2019 | 7,18,03,735.00 |
|
-- | Allotted |
|
|||||||
123 | construction of CHC(Model hospital) including residential quarter at Nasatra in Barpeta District under NHM | Barpeta | 09-11-2019 | 7,18,03,735.00 |
|
-- | Allotted |
|
|||||||
124 | construction of CHC(Model hospital) including residential quarter at Nasatra in Barpeta District under NHM | Barpeta | 09-11-2019 | 7,18,03,735.00 |
|
-- | Allotted |
|
|||||||
125 | construction of CHC(Model hospital) including residential quarter at Baulipukhuri in Sivsagar District under NHM | Sivasagar | 07-01-2019 | 6,59,94,148.00 |
|
-- | In progress |
|
|||||||
126 | construction of CHC(Model hospital) including residential quarter at Lalmati under Boko LAC in Kamrup(R ) District under NHM | Kamrup Rural | 82 | 10-01-2019 | 6,66,13,087.00 |
|
-- | In progress |
Work in progress |
||||||
127 | Construction of Community Health Centre (Ghoirali Model Hospital) including residential quarters at Phuloguri (Rangapara) in Sonitpur District | Sonitpur | Work Order | 49 | NHM/C-CW/CHC/Bogapani/Tinsukia/1985/13/130 | 21-03-2020 | 5,05,00,000.00 |
|
23-05-2022 | In progress |
Work progress is very slow.Present manpower, Materials & Equipements strength are insufficient. Brick work is going on up to Lintel level at Main Hospital Building including Quarters. |
||||
128 | Construction of Community Health Centre [Model Hospital] including residential quarters [phase-I] at Bhogamukh PHC in Jorhat District under NRHM. | Jorhat | -- | 0.00 |
|
-- | Handed Over |
|
|||||||
129 | Construction of Community Health Centre (Model Hospital) including residential Qtrs.(Ph-I) at Nakachari BPHC in Jorhat. | Jorhat | -- | 0.00 |
|
-- | Handed Over |
|
|||||||
130 | Construction of Community Health Centre[Model Hospital] including residential quarters at Sivasagar Old Hospital in Sivasagar | Sivasagar | 65 | -- | 0.00 |
|
-- | In progress | Photos |
|
|||||
131 | Construction of Community Health Centre [Model Hospital] including residential qtrs [phase-I] at Balijuri in Karbi Anglong Dist. Under NRHM | Karbi Anglong | 100 | -- | 0.00 |
|
15-10-2015 | Handed Over | Photos |
|
|||||
132 | Construction of Community Health Centre [Model Hospital] including residential qtrs [phase-I] at Deihori in Karbi Anglong Dist. Under NRHM | Karbi Anglong | 100 | -- | 0.00 | 20-11-2014 | Handed Over | Photos |
|
||||||
133 | Construction of Community Health Centre (MH) including Residential Quarters at Garubandha SD in Sonitpur district under NHM | Sonitpur | Work Order | 99 | NHM/C-CW/G.B. Approved/Strengthening/Garubandha SD/2018-2019/93 | 25-02-2019 | 53,81,000.00 |
|
28-06-2021 | In progress |
Work is in Progress. |
||||
134 | Construction of Community Health Centre (Model Hospital) including Residential Quarters at Phuloni under Diphu LAC in Karbi Anglong District. | Karbi Anglong | Work Order | 84 | NHM/C-CW/CHC (16-17)/Longnit/Karbi Anglong/3498/17/115 | 14-09-2019 | 7,92,57,640.00 |
|
12-08-2021 | In progress |
Work is in progress. |
||||
135 | Construction of Sub-centre [Assam Type], pakage no. NRHMNSC[T] 16 nos of SC-Morigaon Dist under NRHM. | Morigaon | -- | 0.00 | -- | Handed Over | Photos |
|
|||||||
136 | Construction of SC Prefabricated Steel Structure, Brick work in foundation, 112mm thick brick walling at various places of Assam Pkg No. DC1 | Sivasagar | -- | 0.00 | -- | In progress | Photos |
|
|||||||
137 | Construction of Sub Center (Assam type) Pkg No.NRHM-K (11 no SC in Jorhat District). | Jorhat | -- | 0.00 | -- | Handed Over |
|
||||||||
138 | Construction of Sub Center (Assam type) Pkg. No.NRHM/NSC(M) (5 nos of SC -Jorhat District). | Jorhat | -- | 0.00 | -- | Handed Over |
|
||||||||
139 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DC1 [3 Nos of SC in Sivasagar] | Sivasagar | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
140 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DD2 [3 Nos of SC in Golaghat] | Golaghat | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
141 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DD8 [2 Nos of SC in Golaghat] | Golaghat | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
142 | Construction of sub-centres prefab steel structure, brick work in foundation ,112mm thick brick walling at various places of Assam(Pakage no-DD7) | Golaghat | 98 | -- | 0.00 | -- | Completed | Photos |
Out of 24 SC 23 no.s are completed and handed over. |
||||||
143 | Construction of Sub Centre with pre fabricated steel structure,brick work in foundation,112mm thick brick walling at various places of asssam under NH | Bongaigaon | NRHM/C-CW/SC/2012-13/1432/12/PII/47150 | 14-05-2015 | 0.00 |
|
-- | In progress |
|
||||||
144 | Construction of Sub Centre with pre fabricated steel structure,brick work in foundation,112mm thick brick walling at various places of asssam under NH | Bongaigaon | NRHM/C-CW/SC/2012-13/1432/12/PII/47150 | 14-05-2015 | 0.00 |
|
-- | In progress |
|
||||||
145 | Construction of Sub Centre with pre fabricated steel structure,brick work in foundation,112mm thick brick walling at various places of asssam under NH | Bongaigaon | -- | 0.00 | -- | In progress | Photos |
|
|||||||
146 | Construction of SC prefabricated steel structure,brick work in foundation,112 mm thick brick walling at various places of assam under NRHM on Turn key | Cachar | -- | 0.00 | -- | In progress |
|
||||||||
147 | Construction of Sub-Centres prefabricated steel structure,brickwork in foundation,112mm thick brick walling at various places of Assam under NRHM | Darrang | -- | 0.00 | -- | In progress |
|
||||||||
148 | “Construction of Sub centre prefabricated steel structure , brick work in foundation , 112 mm thick brick walling at various places of Assam under | Nagaon | -- | 0.00 |
|
-- | Handed Over |
|
|||||||
149 | “Construction of Sub centre prefabricated steel structure , brick work in foundation , 112 mm thick brick walling at various places of Assam under | Nagaon | -- | 0.00 |
|
-- | Handed Over |
|
|||||||
150 | “Construction of Sub centre prefabricated steel structure , brick work in foundation , 112 mm thick brick walling at various places of Assam under | Nagaon | -- | 0.00 |
|
-- | Handed Over | Photos |
|
||||||
151 | Construction of prefabricated Sub Centre Steel Structure at various places of Assam (93 nos of sub centre is Nalbari, Barprta, Kamrup District) | Kamrup Rural | 95 | -- | 0.00 | -- | In progress |
Construction work of 7 nos. of SC's are on the verge of completion.Balance work of 15 nos. are not yet started by the contractor. |
|||||||
152 | Construction of SC with pre fabricated steel structure , brick work in foundation , 112mm thick brick walling at various places of Assam under NHM on | Udalguri | 100 | -- | 0.00 | -- | Handed Over | Photos |
|
||||||
153 | Construction of Prefabricated Sub centre steel structure under NHM on turn key basis | Goalpara | 52 | -- | 0.00 |
|
-- | In progress | Photos |
|
|||||
154 | Establishment of ECRP-II 6 bedded Prefab ward at 3 nos scheme Kamrup (M) district Assam for FY 2021-22 | Kamrup Metro | Work Order | 40 | -- | 0.00 | -- | Photos |
|
||||||
155 | Construction of Sub-Centres prefabricated steel structure brick work in foundation 112mm thick brick walling at various places of Assam under NRHM | Sonitpur | 100 | -- | 0.00 | 31-08-2018 | In progress | Photos |
Work completed. |
||||||
156 | Construction of Pre fab SC | Kamrup Rural | 100 | -- | 0.00 |
|
-- | In progress | Photos |
|
|||||
157 | Construction of SC Prefabricated Steel Structure, Brickwork in Foundation, 112mm thick brick walling at various places in Assam Pkg No. DC2 | Sivasagar | -- | 0.00 | -- | In progress |
|
||||||||
158 | Construction of SC Prefabricated Steel Structure, Brickwork in foundation, 112mm thick brick walling at various places of Assam Pkg No DC3 | Sivasagar | -- | 0.00 | -- | In progress |
|
||||||||
159 | Construction of SC Prefabricated Steel Structure, Brickwork in foundation, 112mm thick brick walling at various places of Assam Pkg No. DC4 | Sivasagar | -- | 0.00 | -- | In progress | Photos |
|
|||||||
160 | Construction of Prefab Sub-centres | Kamrup Rural | -- | 0.00 |
|
-- | Allotted |
|
|||||||
161 | Construction of SC with pre fabricated steel structure, brick work in foundation, 112mm thick brick walling at various places of Assam under NHM | Goalpara | Work Order | NRHM-C-CW/SC/2012-13/1432/12/PII/47150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
162 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112 mm thick brick walling at various places of Assam Pkg No. DA1 | Tinsukia | 100 | -- | 0.00 |
|
-- | In progress | Photos |
All works completed |
|||||
163 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112 mm thick brick walling at various places of Assam Pkg No. DA2 | Tinsukia | 100 | -- | 0.00 | -- | In progress | Photos |
work completed |
||||||
164 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112 mm thick brick walling at various places of Assam Pkg No. DA3 | Tinsukia | -- | 0.00 | -- | In progress |
|
||||||||
165 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112 mm thick brick walling at various places of Assam Pkg No. DA4 | Tinsukia | -- | 0.00 |
|
-- | In progress |
|
|||||||
166 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112 mm thick brick walling at various places of Assam Pkg No. DA5 | Tinsukia | Work Order | 95 | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed | Photos |
Work in progress |
|||
167 | Construction of Sub-Centre Prefabricated steel structure, brick work in foundation,112mm brick walling under NHM,Morigaon | Morigaon | -- | 0.00 | 20-09-2016 | Handed Over |
|
||||||||
168 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112 mm brick walling at Package No.DB4[4nos of SC in Dibrugarh] | Dibrugarh | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
169 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DC4 [3nos of SC in Sivasagar] | Sivasagar | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
170 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DD4 [3nos of SC in Golaghat] | Golaghat | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
171 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DB2 [3 Nos of SC in Dibrugarh] | Dibrugarh | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
172 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112 mm thick brick walling, Pkg no. DE1 (4 nos. in Jorhat District) | Jorhat | 100 | -- | 0.00 |
|
17-07-2018 | In progress | Photos |
|
|||||
173 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DD1 [3 Nos of SC in Golaghat] | Golaghat | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
174 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DD3 [3 Nos of SC in Golaghat] | Golaghat | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
||||||
175 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DD6 [4 Nos of SC in Golaghat] | Golaghat | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
176 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DD5 [3 Nos of SC in Golaghat] | Golaghat | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
177 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DC2 [3 Nos of SC in Sivasagar] | Sivasagar | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
178 | Construction of SC Prefabricated Steel Structure, Brick Work in Foundation, 112mm thick brick walling at Package No. DA2 [4 Nos of SC in Dhubri] | Dhubri | Work Order | NRHM/C-CW/SC/2012-13/1432/12/PII/147150 | 14-05-2015 | 74,85,10,000.00 |
|
-- | Completed |
|
|||||
179 | Construction of District Drug Ware House | Darrang | No.NHM/C-CW/DDWH/2013-14/2153/14 /34889 | 01-07-2014 | 60,00,000.00 |
|
-- | In progress | Photos |
|
|||||
180 | Construction of District Drug Ware House | Dhemaji | No.NHM/C-CW/DDWH/Grp.F/Dhemaji/ 2314/14/38817 | 01-07-2014 | 0.00 | -- | Completed |
|
|||||||
181 | Construction of District Drug Ware House | Dibrugarh | -- | 0.00 | -- | Handed Over | Photos |
|
|||||||
182 | No.NHM/C-CW/DDWH/2013 14/2153/14 | Dima Hasao | -- | 0.00 | -- | In progress |
|
||||||||
183 | Construction of District Drug Ware House | Goalpara | -- | 0.00 |
|
29-08-2017 | Handed Over |
|
|||||||
184 | Construction of District Drug Ware House | Golaghat | -- | 0.00 | -- | Allotted |
|
||||||||
185 | Construction of District Drug Ware House | Hailakandi | -- | 0.00 | -- | Handed Over |
|
||||||||
186 | Construction of District Drug Ware House | Jorhat | -- | 0.00 | -- | Handed Over |
|
||||||||
187 | Construction of District Drug Ware House | Karbi Anglong | 78 | -- | 0.00 | -- | In progress | Photos |
|
||||||
188 | Construction of District Drug Ware House | Karimganj | -- | 0.00 | -- | Allotted |
|
||||||||
189 | Construction of District Drug Ware House | Kokrajhar | -- | 0.00 | -- | In progress |
|
||||||||
190 | Construction of District Drug Ware House | Morigaon | -- | 0.00 | 24-02-2017 | Handed Over |
|
||||||||
191 | Construction of District Drug Ware House | Nalbari | -- | 0.00 | -- | Handed Over | Photos |
|
|||||||
192 | Construction of District Drug Ware House | Sonitpur | -- | 0.00 | -- | Handed Over |
|
||||||||
193 | Construction of District Drug Ware House | Tinsukia | -- | 0.00 | -- | Handed Over | Photos |
|
|||||||
194 | Construction of District Drug Ware House | Udalguri | No.NHM/C-CW/DDWH/2013-14/2153/14 /34889 | 01-07-2014 | 0.00 | 27-02-2017 | Handed Over | Photos |
|
||||||
195 | Construction of District Drug Ware House Group E at Jt. DHS Office Campus in Darrang District under NHM on Turn Key Basis | Darrang | -- | 0.00 | -- | Handed Over |
|
||||||||
196 | Construction of District Drug Ware House at Jt. DHS Office Campus in Barpeta District | Barpeta | No.NHM/C-CW/DDWH/2013-14/2153/14 /34889 | 01-07-2014 | 0.00 |
|
-- | Handed Over |
|
||||||
197 | Construction of District Drug Ware House | Baksa | NHM/C-CW/DDWH/2013-14/2153/14 /34889 | 07-07-2014 | 60,00,000.00 | -- | Handed Over | Photos |
|
||||||
198 | Construction of District Drug Ware House | Bongaigaon | 100 | -- | 0.00 | -- | Handed Over |
|
|||||||
199 | Construction of District Drug Ware House | Chirang | 01-07-2014 | 0.00 | -- | In progress | Photos |
|
|||||||
200 | Strengthening of Nilambazar PHC in Karimganj District Under NHM Assam | Karimganj | NHM/C-CW/Strengthening/Nilambazar PHC/Karimganj/3707/18/68 | 27-10-2018 | 1,06,80,600.00 |
|
-- | In progress |
|
||||||
201 | Correspondance file for infrastructure Development of Orang PHC-CHC in Udalguri District | Udalguri | 5 | 09-11-2018 | 1,22,96,000.00 | -- | Handed Over |
|
|||||||
202 | Strengthening of Sontali MPHC to CHC in Kamrup(R ) District (Phase-I ) under NHM | Kamrup Rural | 100 | No.NHM/C-CW/Up gradation of MPHC to CHC/Sontoli MPHC/Kamrup®/2588/15/52584 | 18-09-2015 | 2,00,00,000.00 |
|
-- | In progress | Photos |
work completed but defect liability period is not over. |
||||
203 | Construction of SDCH-Hojai DIstrict{Annex Building for increase of bed capacity by additional 20 beds and Renovation of Existing Hojai FRU SDCH} under | Nagaon | -- | 0.00 | -- | In progress |
|
||||||||
204 | Construction of SDCH-Hojai DIstrict{Annex Building for increase of bed capacity by additional 20 beds and Renovation of Existing Hojai FRU SDCH} under | Nagaon | -- | 0.00 | -- | In progress |
|
||||||||
205 | Construction of SDCH-Hojai DIstrict{Annex Building for increase of bed capacity by additional 20 beds and Renovation of Existing Hojai FRU SDCH} under | Nagaon | 98 | -- | 0.00 | -- | In progress | Photos |
Finishing work in progress. Additional estimate forwarded from Honourable D.C sir Hojai for Deep tube well and some modification in original drawing. But yet to be final decision. |
||||||
206 | “Strengthening of PHC at Dagaon in Nagaon District under NHM” Assam | Nagaon | -- | 0.00 |
|
20-03-2017 | Handed Over | Photos |
|
||||||
207 | Strengthening of Sontali MPHC to CHC in Kamrup (R) District under NHM, Assam on turn key basis (Phase -II) | Kamrup Rural | 26 | NHM/C-CW/Up gradation of MPHC to CHC/Sontoli MPHC/Kamrup (R)/2588/15/146 | 04-01-2018 | 2,40,00,000.00 |
|
-- | In progress | Photos |
|
||||
208 | Repairing/Renovation of 257 nos of sub-centres to upgrade them as HWCs Pkg no.HHM/H&WC/SC/Group-A7[ 6Nos of scheme in Dibrugarh District] | Dibrugarh | Work Order | 100 | NHM/C-CW/H&WC/SC/3752/18/167 | 23-02-2019 | 42,57,587.00 | 03-08-2020 | In progress |
|
|||||
209 | Upgradation of Chalantapara MPHC to CHC in Bongaigaon District | Bongaigaon | Work Order | NHM/C-CWUpgradation of Chalantapara MPHC to CHC/Bongaigaon/3988/19/175 | 14-11-2019 | 4,40,00,000.00 |
|
-- |
|
||||||
210 | Construction of GNM School & Hostel building at Sualkuchi in Kamrup(R) District under NHM on Turn Key Basis | Kamrup Rural | 3 | -- | 0.00 |
|
-- | In progress | Photos |
One letter regarding the site condition and about pile load test before pile work is communicated to state office, NHM,Assam. |
|||||
211 | Construction of GNM School & Hostel Building Complex (Phase-I) at Karbi Anglong under NRHM, Group-C for the year 2007-08 | Karbi Anglong | 100 | -- | 0.00 | 02-06-2015 | Handed Over | Photos |
|
||||||
212 | Construction of GNM School & Hostel Building at Titabor in Jorhat District under NHM on Turn Key Basis | Jorhat | 93 | -- | 0.00 | 27-12-2018 | In progress | Photos |
|
||||||
213 | Construction of GNM School & Hostel Building Complex [(Phase-II)HOSTEL BUILDING-vertical extension)] at Karbi Anglong under NRHM on Turn Key Basis | Karbi Anglong | 100 | -- | 0.00 | 02-06-2015 | Handed Over | Photos |
The work was awarded to Mr. Nepolean Kather, contractor by the Mission Director, NHM, Assam by vide W/O. No. NRHM/C-CW/GNM HOSTEL(PH-II)/Diphu/931/11/4982 dated Guwahati the 20th June 2011 on Turnkey Basis and the employer had accepted the bid by the con |
||||||
214 | Establishment of Blood Bank at 200 bedded District Hospital. | Kamrup Metro | NO.NHM/C-CW/Blood Bank/SonapurDH/Kamrup(M)/3268/16/79629 | 11-11-2016 | 29,12,700.00 |
|
-- | Handed Over |
|
||||||
215 | Construction of Blood Bank at Garmur SDCH in Majuli District | Jorhat | NO.NHM/C-CW/BLOOD BANK/GARMUR SDCH/MAJULI/3271/16/76965 | 03-10-2016 | 57,81,000.00 |
|
01-11-2017 | Handed Over | Photos |
|
|||||
216 | Construction of Blood Bank at Dr. Ravi Boro civil Hospital at Mushalpur in Baksa district | Baksa | -- | 0.00 | 30-10-2017 | Handed Over | Photos |
|
|||||||
217 | Construction of new PHC with Quarters | Udalguri | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 | -- | Handed Over |
|
|||||||
218 | Construction of new PHC with Quarters | Dibrugarh | NRHM/C-CW/PHC/2012-13/1444/12/3482 | 18-05-2013 | 0.00 | -- | Handed Over | Photos |
|
||||||
219 | Construction of new PHC with Quarters | Dibrugarh | NRHM/C-CW/PHC/2012-13/1444/12/3482 | 18-05-2013 | 0.00 | -- | Handed Over | Photos |
|
||||||
220 | Construction of PHC including staff quarter at Mahmora in Dibrugarh District under NHM, Assam. | Dibrugarh | NHM-32017/10/2021-ConstructionNHM/77 | 28-08-2021 | 1,39,94,382.00 | -- |
|
||||||||
221 | Construction of new PHC with residential accomodation for Staffs at Baghapara(Dhubri District) Group III | Dhubri | 91 | NRHM/C-CW/PHC/2012-13/1444/12/3482 | 18-05-2013 | 0.00 |
|
-- | In progress | Photos |
Side Drain Apron work is left,Grills of Windows/Ventilators of Main PHC building is not fully completed,Aluminium Works is not completed,painting work of Ceiling is not done,Tiles work finishing has not been completed.painting finishing work is not comple |
||||
222 | Construction of new PHC with residential accomodation for Staffs at Kanaimara(Dhubri District) Group - IV | Dhubri | 85 | -- | 0.00 |
|
-- | In progress | Photos |
Tiles work,ceiling work,Grill fittings,Windows,Ventilators,Doors fittings,Aluminium work,Glass fittings,painting work,Floor finish work,barge board fitting etc are left in the main hospital building as well in the quarters. |
|||||
223 | Construction of new PHC with Quarters | Dibrugarh | NRHM/C-CW/PHC/2012-13/1444/12/26374 | 23-12-2013 | 0.00 | -- | Handed Over | Photos |
|
||||||
224 | Construction of new PHC at Khakrajan under Bokajan LAC in Karbi Anglong District | Karbi Anglong | NHM/32017/20/2021-CONSTRUCTION-NHM/72 | -- | 1,61,01,100.00 | -- | In progress |
|
|||||||
225 | Construction of new PHC with Quarters | Dhubri | -- | 0.00 | -- | In progress |
|
||||||||
226 | Construction of new PHC at Barlengri under Bokajan BPHC (Bokajan LAC) in Karbi Anglong district | Karbi Anglong | NHM/32017/23/2021-Construction-NHM/83 | -- | 1,60,41,000.00 | -- | In progress |
|
|||||||
227 | Construction of new PHC with Quarters | Dhubri | -- | 0.00 | -- | In progress |
|
||||||||
228 | Construction of new PHC with Quarters | Dhubri | NRHM/C-CW/PHC/2012-13/1444/12/28043 | 23-01-2014 | 0.00 | -- | In progress | Photos |
|
||||||
229 | Construction of New PHC with Residential accommodation for Staffs at Kacaharihat MPHC in Dhubri District under NRHM on turnkey basis(Group IV) | Dhubri | NRHM/C-CW/PHC/2012-13/1444/12/28043 | 23-01-2014 | 0.00 |
|
-- | In progress | Photos |
|
|||||
230 | Construction of new PHC with Quarters | Dhubri | NRHM/C-CW/PHC/2012-13/1444/12/28043 | 23-01-2014 | 0.00 | -- | In progress |
|
|||||||
231 | Construction of new PHC with Residential accomodation for Staffs at Radhuramchola MPHC in Dhubri District under NRHM on turnkey basis (Group - VI) | Dhubri | 92 | NRHM/C-CW/PHC/2012-13/1444/12/28043 | 23-01-2014 | 0.00 |
|
-- | In progress | Photos |
Minor civil works at porch area,Side drain with apron,few sanitary fittings,painting work finishes at both main building and as well as in the qtr are left. |
||||
232 | Construction of new PHC with Quarters | Tinsukia | -- | 0.00 | -- | Allotted |
|
||||||||
233 | Construction of new PHC with Quarters | Tinsukia | 100 | NRHM/C-CW/PHC/2012-13/1444/12/38117 | 30-09-2014 | 0.00 | -- | In progress | Photos |
Civil Works 100% completed. External electrification works not done yet. |
|||||
234 | Construction of new PHC with Quarters | Tinsukia | 100 | -- | 0.00 | -- | In progress | Photos |
Work completed and handed over |
||||||
235 | Construction of new PHC with Quarters | Tinsukia | 100 | -- | 0.00 | -- | In progress | Photos |
Work completed |
||||||
236 | Construction of new PHC with Quarters | Tinsukia | 100 | NRHM/C-CW/PHC/2012-13/1444/12/38117 | 30-09-2014 | 0.00 | -- | In progress | Photos |
Work completed and handed over |
|||||
237 | Construction of PHC including staff quarter at Chengamari in Biswanath District. | Biswanath | NHM-32017/15/2021-Construction/72 | 04-08-2021 | 1,37,93,037.00 | -- |
|
||||||||
238 | Construction of new PHC with Quarters | Tinsukia | 100 | -- | 0.00 | -- | Completed | Photos |
Work completed and handed over |
||||||
239 | Construction of PHC including staff quarter at Bahgora MPHC in Lakhimpur District. | Lakhimpur | NHM-32017/14/2021-Construction/74 | 23-07-2021 | 1,39,97,570.00 |
|
-- |
|
|||||||
240 | Construction of new PHC with Quarters | Dhemaji | NRHM/C-CW/PHC/2012-13/1444/12/3498 | 18-05-2013 | 0.00 | -- | In progress |
|
|||||||
241 | Construction of new PHC with Quarters | Lakhimpur | -- | 0.00 | -- | Allotted |
|
||||||||
242 | “Construction of New PHC with Residential accommodation at Garajan SD in Nagaon District under NHM , Assam. | Nagaon | -- | 0.00 |
|
-- | In progress |
|
|||||||
243 | Construction of new PHC with Quarters | Kokrajhar | -- | 0.00 | -- | Allotted |
|
||||||||
244 | Construction of new PHC with Quarters | Lakhimpur | -- | 0.00 | -- | Allotted |
|
||||||||
245 | Construction of New PHC at Borka SC in Kamrup (R) District under NHM, Assam | Kamrup Rural | Work Order | 72 | NHM-32017/17/2021-Construction-NHM/12 | 01-08-2021 | 1,38,82,988.00 |
|
21-02-2023 | In progress |
Work in progress |
||||
246 | Construction of New PHC including residential quarters at Balijuri SC in Biswanath | Biswanath | Work Order | 76 | NHM-32017/16/2021-Construction-NHM/14 | 01-08-2021 | 1,39,78,889.00 | 19-01-2023 | In progress |
Work is in progress. |
|||||
247 | Construction of New PHC including residential accommodation at Garajan SD in Nagaon | Nagaon | Work Order | 95 | NHM-32017/25/2021-Construction-NHM/13 | 11-08-2021 | 1,39,96,921.00 |
|
21-11-2022 | In progress |
Painting and site development work in Progress |
||||
248 | Construction of New PHC including residential accommodation at Kapashbari in Hojai District | Hojai | Work Order | NHM-32017/24/2021-Construction-NHM/11 | 13-08-2021 | 1,40,00,875.00 | 13-02-2023 |
|
|||||||
249 | Construction of New PHC including residential Quarters in Puthimari SC in Nagaon | Nagaon | Work Order | 8 | NHM-32017/18/2021-Construction-NHM/16 | 13-09-2021 | 1,39,97,744.00 | 05-04-2023 | In progress |
Work in progress. |
|||||
250 | Construction of New PHC with residential accommodation for staffs under NRHM at Panbari in Darrang District on Turn Key Basis. | Darrang | -- | 0.00 |
|
-- | Handed Over |
|
|||||||
251 | Construction of new PHC(A/T) with residential quarters in ATC garden under NHM in Messamara T.E. in Golaghat District | Golaghat | 100 | -- | 0.00 |
|
-- | In progress | Photos |
Work completed and handed over |
|||||
252 | Construction of new PHC (A/T) with residential quarters in ATC garden in Golaghat District at Rungamatty T.E. | Golaghat | 100 | -- | 0.00 |
|
-- | In progress | Photos |
work completed and handed over. |
|||||
253 | Construction of PHC(A/T)including residential Qtrs (Dr 1 unit Nurse 2 units) at ATC Garden | Golaghat | 100 | -- | 0.00 | -- | In progress | Photos |
Handed over |
||||||
254 | Constructionn of New PHC with residential accomodation for Staffs at Larkuchi in Nalbari District on turn key basis under NHM,Assam | Nalbari | 100 | -- | 0.00 |
|
-- | In progress | Photos |
final bill amounting to Rs 101.08 lakhs has been paid |
|||||
255 | Construction of New PHC with residential accommodation for staffs at Ramchandi Dinanathpur in Hailakandi District | Hailakandi | Work Order | 100 | -- | 0.00 |
|
-- | Completed |
|
|||||
256 | Construction of PHC including staff quarter at Chengamari in Biswanath District under NHM, Assam | Biswanath | Work Order | 31 | NHM-32017/15/2021-Construction-NHM/72 | 04-08-2021 | 1,37,93,037.00 |
|
09-12-2022 |
Work is in progress. |
|||||
257 | Construction of PHC including staff quarter at Bahgora MPHC in Lakhimpur District under NHM, Assam | Lakhimpur | Work Order | NHM-32017/14/2021-Construction-NHM/74 | 23-07-2021 | 1,39,97,570.00 | 23-01-2023 |
|
|||||||
258 | ‘‘Construction of New PHC with residential accommodation for staffs under NRHM at Guwabari in Baksa District on Turn Key basis’’ | Baksa | 100 | No.NRHM/C-CW/PHC/2012-13/1444/12/9536 | 04-06-2013 | 1,11,60,000.00 |
|
-- | In progress | Photos |
Work Completed |
||||
259 | Construction of new PHC with Quarters | Darrang | 76 | NRHM/C-CW/PHC/2012-13/1444/12/3468 | 18-05-2013 | 0.00 |
|
-- | In progress | Photos |
|
||||
260 | Construction of new PHC with Quarters | Darrang | NRHM/C-CW/PHC/2012-13/1444/12/3468 | 18-05-2013 | 1,11,60,000.00 |
|
24-06-2015 | Handed Over | Photos |
|
|||||
261 | Construction of new PHC at Khakrajan under Bokajan LAC in Karbi Anglong District. | Karbi Anglong | Work Order | 51 | NHM-32017/20/2021-Construction-NHM/72 | 06-08-2021 | 1,61,01,100.00 |
|
22-11-2022 | In progress |
Work in progress. |
||||
262 | Construction of new PHC with Quarters | Udalguri | -- | 0.00 | -- | Handed Over |
|
||||||||
263 | Construction of new PHC Borlengri under Bokajan BPHC (Bokajan LAC) in Karbi Anglong District. | Karbi Anglong | Work Order | 51 | NHM-32017/23/2021-Construction-NHM/83 | 17-08-2021 | 1,60,41,000.00 |
|
06-01-2023 | In progress |
Work is in progress. |
||||
264 | Construction of new PHC with Quarters | Udalguri | NRHM/C-CW/PHC/2012-13/1444/12/3468 | 18-05-2013 | 0.00 |
|
07-06-2017 | Handed Over |
|
||||||
265 | Construction of New PHC including Residential Quarters at Bagoli in Barpeta District under NHM, Assam | Barpeta | Work Order | 4 | NHM-32017/19/2021-Construction-NHM/13 | 13-09-2021 | 1,39,99,259.00 | 13-02-2023 | In progress | Photos |
Work in progress. |
||||
266 | Construction of new PHC with Quarters | Udalguri | NRHM/C-CW/PHC/2012-13/1444/12/3468 | 18-05-2013 | 0.00 | -- | Handed Over | Photos |
|
||||||
267 | Construction of new PHC with Quarters | Sonitpur | NRHM/C-CW/PHC/2012-13/1444/12/3468 | 18-05-2012 | 0.00 | -- | Handed Over |
|
|||||||
268 | Construction of New PHC with residential accommodation for staffs under NHM at Rajagarh MPHC in Udalguri District on Turn Key Basis. | Udalguri | 100 | -- | 0.00 | -- | Handed Over |
|
|||||||
269 | Construction of new PHC with Quarters | Nalbari | -- | 0.00 | -- | Handed Over |
|
||||||||
270 | Construction of new PHC with residential accommodation for staffs under NRHM at Mataikhar (Mudaki) | Kamrup Rural | NRHM/C-CW/PHC/2012-13/1444/12/3468 | 18-05-2013 | 0.00 | 28-03-2015 | Handed Over |
|
|||||||
271 | Construction of new PHC with Quarters | Cachar | NRHM/C-CW/PHC/2012-13/1444/12/789 | 09-04-2013 | 1,11,60,000.00 | -- | In progress |
|
|||||||
272 | Construction of new PHC with Quarters | Karimganj | NRHM/C-CW/PHC/2012-13/1444/12/789 | 09-04-2013 | 0.00 | -- | Completed |
|
|||||||
273 | Construction of new PHC with Quarters | Hailakandi | NRHM/C-CW/PHC/2012-13/1444/12/26930 | 23-12-2013 | 0.00 |
|
-- | Completed |
|
||||||
274 | Construction of New Day Care PHC at Meramukh in Lakhimpur District under NHM, Assam | Lakhimpur | Work Order | NHM/C-CW/Day Care PHC(20-21)/Meramukh/Lakhimpur/4143/20/45 | 08-06-2020 | 65,68,000.00 |
|
27-11-2021 | Completed |
|
|||||
275 | Construction of new PHC with Quarters | Hailakandi | NRHM/C-CW/PHC/2012-13/1444/12/26930 | 23-12-2013 | 0.00 | -- | Completed |
|
|||||||
276 | Construction of new PHC with Quarters | Cachar | 100 | NRHM/C-CW/PHC/2012-13/1444/12/28030 | 23-01-2014 | 0.00 | -- | In progress |
|
||||||
277 | Construction of new PHC with Quarters | Cachar | NRHM/C-CW/PHC/2012-13/1444/12/28030 | 23-01-2014 | 0.00 |
|
-- | Handed Over |
|
||||||
278 | Construction of New PHC with residential accommodation for staffs Parkup Pahar in Karbi Anglong District | Karbi Anglong | 95 | 26-07-2013 | 1,25,00,000.00 | -- | In progress | Photos |
|
||||||
279 | Construction of PHC including Residential Quarters at Dalanibasti in Udalguri District under NHM, Assam | Udalguri | Work Order | NHM/C-CW/New PHC (2019-20)/Assam/19/123 | 05-11-2019 | 1,37,50,000.00 |
|
18-06-2021 | Handed Over |
|
|||||
280 | Construction of new PHC with Quarters | Karimganj | NRHM/C-CW/PHC/2012-13/1444/12/28030 | 23-01-2014 | 0.00 |
|
-- | Handed Over |
|
||||||
281 | Construction of new PHC with Quarters | Nagaon | NRHM/C-CW/PHC/2012-13/1444/12/28030 | 23-01-2014 | 0.00 |
|
-- | In progress |
|
||||||
282 | Construction of New PHC with residential accommodation for staffs at Hidipi in Karbi Anglong District | Karbi Anglong | 100 | 26-06-2013 | 1,25,00,000.00 | -- | In progress | Photos |
|
||||||
283 | Construction of new PHC with Quarters | Nalbari | NRHM/C-CW/PHC/2012-13/1444/12/28030 | 23-01-2014 | 0.00 | -- | Completed | Photos |
|
||||||
284 | Construction of new PHC with Quarters | Baksa | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 | -- | Handed Over | Photos |
|
||||||
285 | Construction of new PHC with Quarters | Baksa | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 |
|
-- | Handed Over |
|
||||||
286 | Construction of new PHC with Quarters | Baksa | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 | -- | Handed Over | Photos |
|
||||||
287 | Construction of new PHC with Quarters | Baksa | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 | -- | Handed Over | Photos |
|
||||||
288 | Construction of New PHC with residential accommodation for Staffs at Pramila in Nagaon District on Turn Key Basis under NHM | Nagaon | Work Order | NRHM/C-CW/PHC/2012-13/1444/12/3468 | 18-05-2013 | 11,16,00,000.00 |
|
-- | Completed |
|
|||||
289 | Construction of new PHC with Quarters | Barpeta | No.NHM/C-CW/PHC/2012-13/1444/12/Part-VII/38342 | 30-09-2009 | 0.00 | -- | Handed Over |
|
|||||||
290 | Construction of new PHC with Quarters | Barpeta | 0 | -- | 0.00 | -- | Allotted |
Scheme withdrawn due to non availability of suitable land. Govt. of India has suggested during NPCC 2018 to considered dropping of the schemes due to non availability of land. Accordingly in the 11th GB meeting of the State Health Mission, NHM, Assam held |
|||||||
291 | Construction of new PHC with Quarters | Barpeta | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 |
|
-- | Handed Over |
|
||||||
292 | Construction of new PHC with Quarters | Cachar | 80 | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 | -- | In progress |
|
||||||
293 | Construction of new PHC with Quarters | Hailakandi | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 |
|
-- | Allotted |
|
||||||
294 | Construction of new PHC with Quarters | Hailakandi | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 |
|
-- | In progress |
|
||||||
295 | Construction of new PHC with Quarters | Karimganj | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 |
|
-- | Handed Over |
|
||||||
296 | Construction of new PHC with Quarters | Nagaon | 100 | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 |
|
-- | In progress | Photos |
|
||||
297 | Construction of PHC including Residential Quarters at Dawdhara in Baksa District. | Baksa | Work Order | 72 | -- | 1,37,50,000.00 |
|
-- | Photos |
Work in Progress. Due to Pandemic situation of 2nd Phase of COVID - 19 sufficient Skill and Unskilled Labour can not able to engage at site. |
|||||
298 | Construction of new PHC with Quarters | Nagaon | 100 | -- | 0.00 | -- | In progress | Photos |
|
||||||
299 | Construction of new PHC with Quarters | Nagaon | 100 | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 | -- | In progress | Photos |
|
|||||
300 | Construction of new PHC with Quarters | Udalguri | NRHM/C-CW/PHC/2012-13/1444/12/38147 | 30-09-2014 | 0.00 | 27-12-2017 | Handed Over | Photos |
|
||||||
301 | Up gradation of Bongaigaon PHC to UPHC | Bongaigaon | NHM/C-CW/UPHC/Bongaigaon/2851/15/54548 | 30-10-2015 | 29,50,000.00 |
|
27-02-2017 | Handed Over |
|
||||||
302 | Upgradation of Ulubari PHC to UPHC in Kamrup (M) District under NHM Two Bid System and on Turn Key Basis | Kamrup Metro | Work Order | 100 | NHM/C-CW/UPHC/Ulubari/2964/15/57/694 | 24-12-2015 | 92,15,000.00 |
|
-- | Completed | Photos |
|
|||
303 | Construction of UPHC in SM Dev Civil Hospital in Cachar District | Cachar | Work Order | 100 | NHM/C-CW/UPHC/Sm Dev CH/Silchar/3280/16/79468 | 09-11-2016 | 75,00,000.00 |
|
-- | Completed | Photos |
|
|||
304 | Upgradation of Cinamara central Hospital to UPHC in Jorhat District under NHM, Assam | Jorhat | Work Order | NHM/C-CW/UPHC/cinamora central hospital/jorhat/2830/15/57131 | 21-09-2015 | 49,32,000.00 |
|
29-07-2016 | Completed |
|
|||||
305 | Upgradation of labour room as per laqshya guidelines pkg no. NHM/Laqshya Gr. V 1no. of Schme Nalbari | Nalbari | -- | 0.00 | -- | In progress |
|
||||||||
306 | Upgradation of Labour room as per Laqshya Guideline Pkg No. NHM/Laqshya/Gr.C 3 Nos. of scheme in Bongaigaon District. | Bongaigaon | -- | 0.00 | -- | In progress |
|
||||||||
307 | Upgradation of Labour room as per Laqshya Guideline. Pkg No. NHM/Laqshya/Gr.T 5Nos. of scheme in Morigaon District | Morigaon | -- | 0.00 | -- | In progress |
|
||||||||
308 | Upgadation of Labour room as per Laqshya Guideline. Pkg No. NHM/Laqshya/Gr. D 4nos. of scheme in Cachar District | Cachar | 100 | -- | 0.00 | -- | In progress |
|
|||||||
309 | Upgradation of Labor room as per Laqshya Guideline. Pkg No. NHM/Laqshya/Gr. R 4Nos. of scheme in Kokrajhar District | Kokrajhar | -- | 0.00 | -- | In progress |
|
||||||||
310 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg no.NHM/Laqshya/Group U [5 nos of scheme in Nagaon District] | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
311 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg no.NHM/Laqshya/Group U [5 nos of scheme in Nagaon District] | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
312 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg no.NHM/Laqshya/Group U [5 nos of scheme in Nagaon District] | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
313 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg no.NHM/Laqshya/Group U [5 nos of scheme in Nagaon District] | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
314 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg no.NHM/Laqshya/Group U [5 nos of scheme in Nagaon District] | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
315 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg no.NHM/Laqshya/Group U [5 nos of scheme in Nagaon District] | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
316 | Upgradation of labor room as per Laqshya Guidline.pkg no.NHM/Laqshya/Group U [5 nos of scheme in Nagaon District] | Nagaon | 100 | -- | 0.00 | -- | Completed |
|
|||||||
317 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group X[6 no of scheme in Sonitpur District] | Sonitpur | 100 | -- | 0.00 | -- | Completed |
|
|||||||
318 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group J [4 no of scheme in Sonitpur District] | Goalpara | -- | 0.00 | -- | Completed |
|
||||||||
319 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group U1 [6 no of scheme in Nagaon District] | Nagaon | 100 | -- | 0.00 | -- | Completed |
|
|||||||
320 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group J [4 no of scheme in Goalpara District] | Goalpara | Work Order | 100 | NHM/C-CW/Labor Room_LAQSHYA/3839/18/85 | 01-09-2019 | 6,68,61,846.00 | 10-01-2020 | Completed |
|
|||||
321 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group C [43 no of scheme in Bongaigaon District] | Bongaigaon | 96 | -- | 0.00 | -- | In progress |
|
|||||||
322 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group K [5 no of scheme in Golaghat District] | Golaghat | 100 | -- | 0.00 | -- | Allotted |
As per modified work order out of 5 no.s HI, 2 no.s works are cancelled. The rest 3 HI work completed. |
|||||||
323 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group E [2 no of scheme in Chirang District] | Chirang | 100 | -- | 0.00 | -- | Completed | Photos |
All Civil & Electrical works are completed. |
||||||
324 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group Y [3 no of scheme in Tinsukia District] | Tinsukia | 100 | -- | 0.00 | -- | Completed |
Work completed and handed over |
|||||||
325 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group G [2 no of scheme in Dhemaji District] | Dhemaji | 100 | -- | 0.00 | -- | Completed |
|
|||||||
326 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group W [4 no of scheme in Sivsagar District] | Sivasagar | -- | 0.00 | -- | Allotted |
|
||||||||
327 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group M [4 no of scheme in Jorhat District] | Jorhat | 10 | -- | 0.00 | -- | Allotted |
|
|||||||
328 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group V [1 no of scheme in Nalbari District] | Nalbari | 100 | -- | 0.00 | -- | Completed |
|
|||||||
329 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group R [4 no of scheme in Kokrajhar District] | Kokrajhar | 100 | -- | 0.00 | -- | Completed |
|
|||||||
330 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group S [7 no of scheme in Lakhimpur District] | Lakhimpur | 78 | -- | 0.00 | -- | In progress |
|
|||||||
331 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group I [4 no of scheme in Dibrugarh District] | Dibrugarh | 100 | -- | 0.00 | -- | Completed |
|
|||||||
332 | Upgradation of Labor Room as per LAQSHYA Guidline.Pkg No. NHM/Lakshya/Group B [6 no of scheme in Barpeta District] | Barpeta | 100 | -- | 0.00 | -- | Completed |
|
|||||||
333 | Construction of 10(Ten) Bedded Geriatric unit at Dr. Rabi Boro Civil Hospital | Baksa | Work Order | 100 | NHM/C-CW/Geriatric Unit/NPHCE/DCH/Baksa/PIP(2016-17)/3387/17/6933 | 17-06-2017 | 35,00,000.00 |
|
-- | Completed | Photos |
Work completed and Handed Over. |
|||
334 | Construction of 10 (Ten) Bedded Geriatric unit at S.M.K. Civil Hospital in Nalbari District | Nalbari | Work Order | NHM/C-Cw/Geriatric Unit/NPHCE/DCH/Nalbari/PIP(2016-17)/3408/17/13 | 28-07-2017 | 34,90,000.00 |
|
17-02-2020 | Completed |
|
|||||
335 | Construction of 10(Ten) Bedded Geriatric unit at District Civil Hospital in Bongaigaon | Bongaigaon | 70 | NO.NHM/C-CW/Geriatric Unit/NPHCE/DCH/Bongaigaon/PIP(2016-17)3390/17/6948 | 17-06-2017 | 35,00,000.00 | -- | Allotted | Photos |
|
|||||
336 | Construction of 10 (Ten) Bedded Geriatric unit at District Civil Hospital Diphu in karbi-Anglong District | Karbi Anglong | Work Order | 94 | NHM/C-Cw/GeriatricUnit/NPHCE/DCH/Karbi-Anglong/PIP(2016-17)/3405/17/13 | 11-07-2017 | 35,00,000.00 |
|
24-09-2018 | Completed | Photos |
|
|||
337 | Construction of 10(Ten)Bedded Geriatric unit at S.M Dev Civil Hospital | Cachar | Work Order | 100 | NHM/C-CW/GeriatricUnit/NPHCE/DCH/Cacher/PIP(2016-17)/3393/17/6886 | 16-06-2017 | 35,00,000.00 |
|
17-07-2018 | Completed | Photos |
|
|||
338 | Construction of 10 (Ten) Bedded Geriatric unit at District Civil Hospital at Tinsukia District | Tinsukia | Work Order | 100 | NHM/C-Cw/GeriatricUnit/NPHCE/DCH/Tinsukia/PIP(2016-17)/3413/17/6917 | 17-06-2017 | 35,00,000.00 |
|
22-10-2018 | Completed | Photos |
Work completed |
|||
339 | Construction of 10(Ten) Bedded Geriatric Unit at JSB Civil Hospital | Chirang | 100 | NHM/C-CW/GeriatricUnit/NPHCE/DCH/Chirang/PIP(2016-17)3429/17/6871 | 16-06-2017 | 35,00,000.00 | -- | Allotted | Photos |
Work is completed and Handing & Taking Over is in process. |
|||||
340 | Construction of 10 (Ten) Bedded Geriatric unit at District Civil Hospital in Haflong | Dima Hasao | NHM/C-Cw/GeriatricUnit/NPHCE/DCH/Dima Hasao/PIP(2016-17)/3347/17/12 | 12-07-2017 | 35,00,000.00 | -- |
|
||||||||
341 | Construction of 10(Ten) Bedded Geriatric unit at District Civil Hospital | Dhemaji | -- | 0.00 | -- |
|
|||||||||
342 | Construction of 10 (Ten) Bedded Geriatric unit at District Civil Hospital Udalguri | Udalguri | Work Order | 100 | NHM/C-Cw/GeriatricUnit/NPHCE/DCH/Udalguri/PIP(2016-17)/3416/17/6901 | 17-06-2017 | 35,00,000.00 |
|
18-10-2018 | Handed Over | Photos |
|
|||
343 | Construction of Incinerator House with installation, erection of incinerator with pillar at District Civil Hospital in Goalpara District under NHM | Goalpara | Work Order | 100 | NHM/C-CW/NPHCE/Geriatric Unit/DCH/Goalpara/PIP(2016-17)/3399/17/167 | 24-06-2019 | 16,26,676.00 |
|
-- | Completed | Photos |
|
|||
344 | Construction of 10(Ten)Bedded Geriatric unit at District Civil Hospital Sonapur in Kamrup(M) District | Kamrup Metro | Work Order | 100 | NHM/C-CW/Geriatric/NPHCE/DCH/Kamrup(M)/PIP(2016-17)3402/17/13 | 12-07-2017 | 35,00,000.00 |
|
-- | Completed | Photos |
|
|||
345 | Construction of 10 (Ten) Bedded Geriatric unit at District Civil Hospital in Kokrajhar District | Kokrajhar | 100 | NHM/C-Cw/GeriatricUnit/NPHCE/DCH/Kokrajhar/PIP(2015-16)/2961/17/4599 | 19-05-2017 | 35,00,000.00 |
|
-- | Allotted | Photos |
The Work was Handed over to the Authority in 2019. Non Functioning till date. However the Building was used as covid ward during the covid pandemic. |
||||
346 | Construction of Geriatric Unit (Assam Type) at District Civil Hospital in Morigaon District Group-(C) Under NHM, Assam | Morigaon | -- | 0.00 |
|
31-10-2016 | Handed Over | Photos |
|
||||||
347 | Construction of Geriatric unit at B.P. Civil hospital in Nagaon District ( Group -B) under NHM , Assam | Nagaon | -- | 0.00 | -- | Handed Over | Photos |
|
|||||||
348 | Construction of 10(Ten) Bedded Geriatric Unit at Mangaldai Civil Hospital in Darrang District under NHM,Assam on Turn key Basis. | Darrang | 100 | -- | 0.00 |
|
-- | In progress | Photos |
|
|||||
349 | Construction of 10(Ten) Bedded Geriatric Unit at K.K Civil Hospital in Golaghat District | Golaghat | Work Order | 100 | -- | 0.00 |
|
-- | Completed |
|
|||||
350 | Construction of Geriatric Unit (Assam Type) at District Civil Hospital Karimganj in Karimganj District Group-A, Under NHM Assam | Karimganj | Work Order | NHM/C-CW/Geriatric Unit/NPHCE/PIP(2015-2016)/Karimganj/2886/15/58180 | 07-01-2016 | 35,00,000.00 |
|
-- | Completed |
|
|||||
351 | Construction of Geriatric Unit (Assam Type) at District Civil Hospital in Dhubri District Group-F under NHM, Assam | Dhubri | Work Order | NHM/C-CW/Geriatric Unit/DCH/NPHCE/PIP(2015-16)/Dhubri/2959/15/60464 | 09-03-2016 | 35,00,000.00 |
|
-- | Completed |
|
|||||
352 | Construction of Blood Bank with Blood Component Separation Unit at Mangaldoi Civil Hospital Campus in Darrang District under NHM On Turn Key Basis | Darrang | 100 | -- | 0.00 |
|
-- | In progress | Photos |
|
|||||
353 | Construction of Blood Bank with Blood Component Separation Unit at Kanaklata Civil Hospital Campus in Sonitpur District under NHM, Assam | Sonitpur | -- | 0.00 | -- | In progress |
|
||||||||
354 | Construction of Blood Bank with Blood Component Separation Unit at Kanaklata Civil Hospital Campus in Sonitpur District under NHM, Assam | Sonitpur | 100 | -- | 0.00 |
|
31-07-2018 | In progress | Photos |
Civil work completed. |
|||||
355 | Construction of Blood Bank with blood separation unit at Dhubri District Hospital campus in Dhubri District under NHM Assam on turnkey basis. | Dhubri | -- | 0.00 | -- |
|
|||||||||
356 | Construction of Blood Bank with Blood component Separation Unit(BCSU)at B.P Civil Hospital. | Nagaon | Work Order | 100 | NO.NHM/C-CW/Blood Bank/B.P Civil Hospital/Nagaon/3269/76995 | 01-10-2016 | 68,39,000.00 |
|
30-08-2018 | In progress | Photos |
WORK COMPLETED AND FUNCTIONING |
|||
357 | Construction of Blood Bank with Blood Component Separation unit at SMK Civil Hospital (at 2nd Flloor of OPD Block) in Nalbari District | Nalbari | Work Order | NHM/C-CW/Blood Bank/SMK Civil Hospital/Nalbari/3267/16/76969 | 01-10-2016 | 54,21,000.00 |
|
-- | Completed |
|
|||||
358 | Construction of 10 Bedded Eye Wing with Eye O,T, at Gohpur FRU in Sonitpur District under NRHM on Turn Key Basis | Sonitpur | Work Order | 100 | -- | 0.00 | -- | In progress | Photos |
Work completed and handed over. |
|||||
359 | Construction of Eye O.T. and Eye ward at Howraghat CHC in Karbi Anglong District under NHM, Assam. | Karbi Anglong | Work Order | 79 | NHM/C-CW/Eye OT & Eye Ward/DH/3982/19/185 | 29-12-2020 | 80,00,000.00 |
|
21-06-2022 | In progress |
Work in progress. 12+ nos of workers found at site [Expected date of completion Jan, 2023] |
||||
360 | Renovation of Eye O.T. at Sonapur in Kamrup(M) District under NHM, Assam | Kamrup Metro | Work Order | NHM/C-CW/Rep&Ren/Eye OT/3995/19/19 | 26-12-2019 | 7,86,300.00 |
|
30-01-2021 | Completed |
|
|||||
361 | Upgradation of existing SC to PHC at Koilamati under Chowkihola BPHC (under Bokajan LAC) in Karbi Anglong District | Karbi Anglong | NHM/32017/22/2021-Construction-NHM/71 | -- | 1,60,89,600.00 | -- | In progress |
|
|||||||
362 | Strengthening of PHC at Tamarhat in Dhubri District under NHM,Assam | Dhubri | -- | 0.00 |
|
-- | In progress | Photos |
|
||||||
363 | Proposal against sub Centre up-gradation to PHC at Dhopguri in Udalguri District. | Udalguri | 87 | NHM/C-Cw/ Proposal/Jt. DHS/S.C Up-gradation to PHC/ Dhopguri/Udalguri/3360/17/11 | 16-05-2018 | 1,28,71,000.00 |
|
-- | In progress |
|
|||||
364 | Up gradation of East Guwahati State Dispensary to PHC at Assam Engineering Institute Campus under NHM , Assam | Kamrup Metro | Work Order | -- | 0.00 |
|
-- | Handed Over |
|
||||||
365 | Upgradation of SC to PHC [Construction of new Building] at Kushtoli in Morigaon District under NRHM | Morigaon | -- | 0.00 | 17-10-2012 | Handed Over | Photos |
|
|||||||
366 | Upgradation of SC to PHC[Construction of new Building] at Monipurtup in Morigaon District under NRHM | Morigaon | -- | 0.00 | 02-11-2011 | Handed Over | Photos |
|
|||||||
367 | Upgradation of Existing SC to PHC at Koilamati under Chowkihola BPHC (under Bokajan LAC) in Karbi Anglong District. | Karbi Anglong | Work Order | NHM-32017/22/2021-Construction-NHM/71 | 06-08-2021 | 1,60,89,600.00 | 06-02-2023 | In progress |
|
||||||
368 | Construction of New Urban PHC Building at Bhetapara SD in Kamrup(M) District | Kamrup Metro | NHM/C-CW/UPHC/Bhetapara-Kamrup(M)/3966/19/41 | 14-06-2019 | 1,36,01,812.00 | -- | In progress |
|
|||||||
369 | Strengthening of UPHC to upgrade them as UHWC under NHM, Assam,in Dibrugarh District. | Dibrugarh | Work Order | NHM/C-CW/UPHC to H & WC/3862/18-19/337 | 03-02-2020 | 3,74,400.00 | -- | Completed |
|
||||||
370 | Construction of Trauma centre | Tinsukia | NHM/C-CW/Trauma Centre/Margherita/ 2764/15/58234 | 11-01-2016 | 99,99,000.00 |
|
-- | In progress |
|
||||||
371 | CONSTRUCTION OF ASSAM HILLS MEDICAL COLLEGE & RESEARCH INSTITUTE,DIPHU,KARBIANGLONG ON TURN KEY BASIS | Karbi Anglong | -- | 0.00 | -- | In progress |
|
||||||||
372 | Construction of New labour Room with 4(Four) Bedded Maternity ward (Assam Type) at Jhaskhal part-III Sub-Centre, Group(N) in Dhubri District under NHM | Dhubri | 100 | -- | 0.00 | -- | Completed | Photos |
|
||||||
373 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-73 [6 Nos of scheme in Dhemaji Dist.] | Dhemaji | Work Order | 60 | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 41,98,798.00 |
|
31-12-2022 | In progress |
Work is in progress and Cencellation letter for Meseki Chapori SC already sent. It is included at Buildingless SC under PM ABHIM |
||||
374 | Construction of New Labour room with 4(four) Bedded Maternity Ward(Assam Type) at Berabhanga SC,Group(O) in Dhubri District under NHM,Assam | Dhubri | -- | 0.00 |
|
-- | In progress |
|
|||||||
375 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-73 [6 Nos of scheme in Dhemaji District | Dhemaji | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 41,98,798.00 |
|
31-12-2022 | In progress |
|
||||||
376 | RCC stagging & Deep Tube Well | Chirang | -- | 0.00 | -- |
|
|||||||||
377 | Construction of New Labour Room with 4(Four) Bedded Maternity Ward(Assam Type) at Bengirvita Sub-Centre, Group(L) in Dhubri District under NHM,Assam | Dhubri | -- | 0.00 |
|
-- | In progress |
|
|||||||
378 | Upgradation of existing MPHC to PHC at Rajapathar under Howraghat BPHC (under Diphu LAC) in Karbi Anglong District | Karbi Anglong | -- | 1,60,98,600.00 | -- | In progress |
|
||||||||
379 | Repairing/Renovation of 120 Nos. of Sub-Centers to upgrade them as H&WC of Assam from RoP 2021-22 Group-9 (5 nos. Scheme in Jorhat Dist.) | Jorhat | Work Order | NHM/C-CW/32050/115/2021-Construction-NHM/55 | 24-01-2022 | 29,61,105.00 |
|
31-12-2022 | In progress |
|
|||||
380 | Construction of Diagnostic Centre with Tele Radiology Facility at Diphu Civil Hospital in Karbi Anglong District. | Karbi Anglong | 63 | 12-09-2014 | 51,25,450.00 | -- | In progress | Photos |
|
||||||
381 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-23 [6 Nos of scheme in Golaghat Dist.] | Golaghat | Work Order | 98 | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 37,74,463.00 |
|
13-01-2023 | In progress |
work is in progress |
||||
382 | Renovation of existing BPHC Main Building (New) at Putia , Sisiborgaon in Dhemaji District under NHM, Assam. | Dhemaji | NHM-32049/1/2020-Construction-NHM/64 | 07-12-2020 | 1,05,97,171.00 |
|
-- | In progress |
|
||||||
383 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-12 [7 Nos of scheme in Goalpara Dist.] | Goalpara | Work Order | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 48,32,363.00 |
|
14-01-2023 | In progress |
|
|||||
384 | Construction of District Early Intervention Centre Group-I at S.K Roy Civil Hospital in Hailakandi District under NHM | Hailakandi | Work Order | NHM/C-CW/DEIC/2014-15/2407/14/46167 | 10-04-2015 | 17,29,00,000.00 |
|
-- | Completed |
|
|||||
385 | Establishing 20 bedded ward at CHCs at various places of Assam under ECRP-II, NHM, Assam on Turnkey Basis, Group-27, 1 Nos. 20 bedded Ward in Nalbari | Nalbari | Work Order | NHM-32031/4/2021-Construction-NHM/34 | 01-02-2022 | 32,24,821.00 |
|
28-11-2022 | In progress |
|
|||||
386 | Construction of District Early Intervention Centre at Sonapur District Hospital in Kamrup(M) District under NRHM on turn key basis | Kamrup Metro | -- | 0.00 |
|
-- | Handed Over |
|
|||||||
387 | Repairing/Renovation of 185 Nos. of Sub-Centers to upgrade them as H&WC of Assam from RoP 2019-20 Group-27 (4 nos. Scheme in Tinsukia Dist.) | Tinsukia | Work Order | 60 | NHM/C-CW/32050/14/2020-Construction-NHM/228 | 22-06-2021 | 29,47,116.00 |
|
28-12-2022 | In progress | Photos |
2 Nos completed, 2 in progress |
|||
388 | Repairing/ Renovation of SC to upgrade them as HWC at various places of Assam (67nos of Balance HWC from 2018-19), Group I: 5nos of schemes in Hailaka | Hailakandi | Work Order | 95 | NHM/32050/3/2018-CONSTRUCTION-NHM-NHM/400 | -- | 41,99,015.00 |
|
-- | In progress |
Work is in Progress. |
||||
389 | Establishing 20 bedded ward at CHCs at various places of Assam under ECRP-II, NHM, Assam on Turnkey Basis, Group-7, 1 Nos.20 bedded Ward in Chirang | Chirang | Work Order | 100 | NHM-32031/4/2021-Construction-NHM/34 | 01-02-2022 | 32,24,821.00 |
|
21-11-2022 | In progress | Photos |
All works are completed satisfactorily |
|||
390 | Establishment of Health & Wellness centre at Different Locations of Assam | Kamrup Rural | -- | 0.00 | -- | Handed Over |
|
||||||||
391 | Repairing/ Renovation of SC to upgrade them as HWC at various places of Assam (67nos of Balance HWC from 2018-19), Group F: 5nos of schemes in Dhemaji | Dhemaji | Work Order | 100 | NHM/32050/3/2018-Construction-NHM-NHM/400 | -- | 32,29,191.00 |
|
-- | Completed |
Work Completed. |
||||
392 | Establishing 20 bedded ward at CHCs at various places of Assam under ECRP-II, NHM, Assam on Turnkey Basis, Group-2, 1 Nos. 20 bedded Ward in Barpeta | Barpeta | Work Order | NHM-32031/4/2021-Construction-NHM/34 | 01-02-2022 | 32,24,821.00 |
|
12-09-2022 | In progress |
|
|||||
393 | Establishment of Health & wellness Centre at Different location of Assam | Baksa | 100 | -- | 0.00 | -- | Handed Over |
Completed & Functioning |
|||||||
394 | Repairing/ Renovation of SC to upgrade them as HWC at various places of Assam (67nos of Balance HWC from 2018-19), Group M: 5nos of SC in Udalguri Dis | Udalguri | Work Order | 98 | NHM/32050/3/2018-Construction-NHM-NHM/400 | -- | 30,81,012.00 |
|
-- | In progress |
Work is in Progress. |
||||
395 | Repairing/Renovation of 67 Nos. of Sub-Centre to upgrade them as H&WC of Assam from RoP 2018-19 Group-J (5 nos. Scheme in Karimganj District) | Karimganj | Work Order | 100 | NHM-32050/3/2018-Construction-NHM-NHM/400 | 22-06-2021 | 34,97,101.00 |
|
06-05-2022 | Handed Over |
Completed and Handing over |
||||
396 | Establishment of health & wellness Centre at Different location of Assam | Goalpara | 55 | -- | 0.00 | -- | Handed Over | Photos |
|
||||||
397 | Repairing/ Renovation of 120nos of SC to upgrade them as HWC at various places of Assam from ROP 2021-22, Group 1 (5nos in Dhemaji Dist | Dhemaji | 5 | NHM/32050/26/2022-Construction-NHM-NHM | -- | 33,49,911.00 |
|
-- | In progress |
Work in Progress. |
|||||
398 | Repairing/Renovation of 234 Nos. of Sub-Centre in PBS dist. to upgrade them as H&WC of Assam from RoP 2019-20 Group-B (12 nos. Scheme in Barpeta Dist | Barpeta | Work Order | 100 | NHM/C-CW/32050/52/2019-Construction-NHM/611 | 12-10-2020 | 64,40,394.00 |
|
31-12-2021 | Handed Over |
Completed and Handed over |
||||
399 | Establishment of health & Wellness Centre at different places of Assam | Barpeta | 100 | -- | 0.00 | -- | Handed Over |
Completed and Handed over. Functioning. |
|||||||
400 | Repairing/ Renovation of 120nos of SC to upgrade them as HWC at various places of Assam from ROP 2021-22, Group 2 (4nos in Dhemaji Dist | Dhemaji | 70 | NHM/32050/155/2021-Construction-NHM-NHM/55 | -- | 28,79,693.00 | -- | In progress |
Work in Progress. |
||||||
401 | Repairing/Renovation of 67 Nos. of Sub-Centre to upgrade them as H&WC of Assam from RoP 2018-19 Group-D (5 nos. Scheme in Chirang District) | Chirang | Work Order | 100 | NHM-32050/3/2018-Construction-NHM-NHM/400 | 22-06-2021 | 32,26,934.00 |
|
25-06-2022 | Handed Over | Photos |
Handing over& Functioning |
|||
402 | Repairing/Renovation of 234 Nos. of Sub-Centre in PBS dist. to upgrade them as H&WC of Assam from RoP 2019-20 Group-Q (10 nos. Scheme in Kamrup(R) Dis | Kamrup Rural | Work Order | 100 | NHM/C-CW/32050/52/2019-Construction-NHM/611 | 12-10-2020 | 63,09,825.00 |
|
18-11-2021 | Handed Over |
Work completed. Handing over under process |
||||
403 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-68 [7 Nos of scheme in Dhubri Dist.] | Dhubri | Work Order | 46 | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 46,43,574.00 |
|
13-02-2023 | In progress |
work is in progress |
||||
404 | Construction of Isolation Ward Ward (Male & Female)including demolishing of the Existing Isolation Ward. | Nagaon | NHM/C-CW/ DCH/Construction of Isolation Ward /10 Bedded/Nagaon/2783/15/52864 | 23-07-2015 | 28,99,000.00 |
|
05-02-2017 | Handed Over | Photos |
|
|||||
405 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-44 [6 Nos of scheme in Nagaon Dist.] | Nagaon | Work Order | 25 | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 41,97,992.00 |
|
04-03-2023 | In progress |
Work in Progress |
||||
406 | Establishment of Health & Wellness Centre at Different location of Assam | Udalguri | 100 | -- | 0.00 | -- | Handed Over |
|
|||||||
407 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-42 [6 Nos of scheme in Nagaon Dist.] | Nagaon | Work Order | 5 | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 41,97,383.00 |
|
22-02-2023 | In progress |
Work in Progress |
||||
408 | Establishing 20 bedded ward at CHCs at various places of Assam under ECRP-II, NHM, Assam on Turnkey Basis, Group-1, 1 Nos. 20 bedded Ward in Baksa Dis | Baksa | Work Order | NHM-32031/4/2021-Construction-NHM/34 | 01-02-2022 | 32,24,821.00 |
|
16-12-2022 | In progress |
|
|||||
409 | Construction of Boundary wall at B.P Civil Hospital in Nagaon District | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
410 | Establishment of Health & Wellness Centre at different Locations of Assam | Darrang | -- | 0.00 | -- | Completed |
|
||||||||
411 | Establishing 20 bedded ward at CHCs at various places of Assam under ECRP-II, NHM, Assam on Turnkey Basis, Group-11, 2 Nos 20 bed Ward in Dibrugarh Di | Dibrugarh | Work Order | NHM-32031/4/2021-Construction-NHM/34 | 01-02-2022 | 64,49,642.00 |
|
03-01-2023 | In progress |
|
|||||
412 | Establishment of Health & Wellness Centre at Different Locations of Assam | Dhubri | -- | 0.00 | -- | Completed |
|
||||||||
413 | Establishing 20 bedded ward at CHCs at various places of Assam under ECRP-II, NHM, Assam on Turnkey Basis, Group-8, 1 Nos. 20 bedded Ward in Darrang D | Darrang | Work Order | NHM-32031/4/2021-Construction-NHM/34 | 01-02-2022 | 32,24,821.00 |
|
05-01-2023 | In progress |
|
|||||
414 | Establishment of Health & Wellness Centre at Different Locations of Assam | Dibrugarh | -- | 0.00 | -- | Completed |
|
||||||||
415 | Establishing 20 bedded ward at CHCs at various places of Assam under ECRP-II, NHM, Assam on Turnkey Basis, Group-9, 2 Nos 20 bed Ward in Dhemaji Distr | Dhemaji | Work Order | 20 | NHM-32031/4/2021-Construction-NHM/34 | 01-02-2022 | 64,49,642.00 |
|
05-01-2023 | In progress |
work is in progress. |
||||
416 | Establishment of Health & Wellness Centres at Different Locations of Assam | Hailakandi | -- | 0.00 | -- | Completed |
|
||||||||
417 | Repairing/Renovation of 234 Nos. of Sub-Centre in PBS dist. to upgrade them as H&WC of Assam from RoP 2019-20 Group-Z (8 nos. Scheme in Nagaon Distric | Nagaon | Work Order | 100 | NHM/C-CW/32050/52/2019-Construction-NHM/611 | 12-10-2020 | 55,52,026.00 |
|
27-01-2022 |
work completed and Handed over |
|||||
418 | Repairing/Renovation of 200 Nos. of Sub-Centers to upgrade them as H&WC of Assam from RoP 2021-22 Group-13 (7 nos. SC in Sonitpur District) | Sonitpur | Work Order | NHM-32050/46/2021-Construction-NHM-NHM/19 | 18-11-2021 | 48,31,950.00 |
|
06-03-2023 | In progress |
|
|||||
419 | Renovation of Labour Room and SNCU | Nagaon | -- | 0.00 |
|
-- | Handed Over |
|
|||||||
420 | Establishment of Health & Wellness Centre at Different Locations of Assam | Goalpara | -- | 0.00 | -- | Completed |
|
||||||||
421 | Repairing /Renovation of 200 Nos. of Sub-Centre to upgrade them as Health @ Wellness Centre at various places of Assam from RoP 2021-22 Group 17 (6 no | Sonitpur | Work Order | 100 | NHM-32050/46/2021-Construction-NHM-NHM/19 | 18-11-2021 | 39,73,877.00 |
|
21-11-2022 | Completed |
Work has been completed. |
||||
422 | Repairing/Renovation of 200 Nos. of Sub-Centers to upgrade them as H&WC of Assam from RoP 2021-22 Group-12 (7 nos. SC in Sonitpur District) | Sonitpur | Work Order | NHM-32050/46/2021-Construction-NHM-NHM/19 | 18-11-2021 | 44,38,342.00 |
|
06-03-2023 | In progress |
|
|||||
423 | Establishment of Health & Wellness Centres at Different Locations of Assam | Jorhat | 100 | -- | 0.00 | -- | In progress | Photos |
Hemlai SC and Eporia SC works are started lately due to local problems. But now the works is going on. |
||||||
424 | Addl. Works in the office of Assam Medical Service Corporation Ltd. At Central Warehouse campus, Narengi, Guwahati-26. Kamrup(M) | Kamrup Metro | Work Order | -- | 0.00 |
|
20-12-2022 | In progress |
|
||||||
425 | Construction of Labour room with 4 bedded Maternity Ward (Assam Type) Group-D | Chirang | -- | 0.00 | -- | In progress | Photos |
|
|||||||
426 | Repairing/Renovation of 592 Nos. of Sub-Centre to upgrade them as H&WC of Assam from RoP 2021-22 Group-2 (7 nos. Scheme in Baksa District) | Baksa | Work Order | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 48,99,440.00 |
|
18-02-2023 | In progress |
|
|||||
427 | Establishment of Health & Wellness Centre at different locations of Assam. | Morigaon | -- | 0.00 | -- | Completed |
|
||||||||
428 | Repairing /Renovation of 200 Nos. of Sub-Centre to upgrade them as Health @ Wellness Centre at various places of Assam from RoP 2021-22 Group 2 (7 nos | Biswanath | Work Order | 85 | NHM-32050/46/2021-Construction-NHM-NHM/19 | 18-11-2021 | 46,31,137.00 |
|
21-11-2022 | In progress |
Work is in progress. |
||||
429 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-1 [6 Nos of scheme in Baksa Dist.] | Baksa | Work Order | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 41,99,475.00 |
|
17-02-2023 | In progress |
|
|||||
430 | Construction of Labour room with 4 bedded Maternity Ward (Assam Type) Group-E | Chirang | -- | 0.00 | -- | In progress |
|
||||||||
431 | Establishment of Health & Wellness Centre at different locations Assam. | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
432 | Repairing /Renovation of 200 Nos. of Sub-Centre to upgrade them as Health @ Wellness Centre at various places of Assam from RoP 2021-22 Group-06 (7 no | Dibrugarh | Work Order | 90 | NHM-32050/46/2021-Construction-NHM-NHM/19 | 18-11-2021 | 48,86,642.00 |
|
25-11-2022 | In progress |
Work in Progress. Site is handed over to the contractor as on 18/08/2022 by DHS |
||||
433 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-10 [7 Nos of scheme in Bongaigaon Dist. | Bongaigaon | Work Order | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 48,69,998.00 |
|
18-02-2023 | In progress |
|
|||||
434 | Establishment of Health & Wellness Centre at different locations Assam. | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
435 | Repairing /Renovation of 200 Nos. of Sub-Centre to upgrade them as Health @ Wellness Centre at various places of Assam from RoP 2021-22 Group-05 (5 no | Dibrugarh | Work Order | 50 | NHM-32050/46/2021-Construction-NHM-NHM/19 | 18-11-2021 | 35,19,797.00 |
|
08-11-2022 | In progress |
Work in Progress. |
||||
436 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-9 [8 Nos of scheme in Bongaigaon Dist.] | Bongaigaon | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 55,75,812.00 |
|
18-02-2023 | In progress |
|
||||||
437 | Construction of Labour room with 4 bedded Maternity Ward (Assam Type) | Dhubri | NHM/C-CW/Labour Room Cum 4 Bedded Maternity ward /Berabhanga/Dhubri/ 2785/15 | 16-10-2015 | 25,00,000.00 | -- |
|
||||||||
438 | Establishment of Health & Wellness Centre at different locations Assam. | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
439 | Repairing /Renovation of 200 Nos. of Sub-Centre to upgrade them as Health @ Wellness Centre at various places of Assam from RoP 2021-22 Group-04 (8 no | Dibrugarh | Work Order | 40 | NHM-32050/46/2021-Construction-NHM-NHM/19 | 18-11-2021 | 56,29,068.00 |
|
21-10-2022 | In progress |
Work in Progress. |
||||
440 | Repairing/Renovation of 120 Nos. of Sub-Centers to upgrade them as H&WC of Assam from RoP 2021-22 Group-10 (5 nos. Scheme in Jorhat Dist.) | Jorhat | Work Order | NHM-32050/115/2021-Construction-NHM/55 | 24-01-2022 | 30,35,239.00 |
|
04-03-2023 | In progress |
|
|||||
441 | Construction of Labour room with 4 bedded Maternity Ward (Assam Type) | Dhubri | NHM/C-CW/Labour Room Cum 4 Bedded Maternity ward /Bengirvita/Dhubri/ 2852/ 15/54205 | 16-10-2015 | 25,00,000.00 | -- |
|
||||||||
442 | Establishment of Health & Wellness Centre at different locations Assam. | Nagaon | -- | 0.00 | -- | Completed |
|
||||||||
443 | Repairing /Renovation of 200 Nos. of Sub-Centre to upgrade them as Health @ Wellness Centre at various places of Assam from RoP 2021-22 Group-18 (7 no | Sonitpur | Work Order | 90 | NHM-32050/46/2021-Construction-NHM-NHM/19 | 18-11-2021 | 45,62,849.00 |
|
07-11-2022 | In progress |
Work is in progress. |
||||
444 | Repairing/Renovation of 592 Nos. of SC to upgrade them as H&WC at various places of Assam in Rop-2021-22 Group-88 [7 Nos of scheme in Lakhimpur Dist.] | Lakhimpur | Work Order | NHM-32050/46/2021-Construction-NHM/77 | 19-02-2022 | 48,50,293.00 |
|
-- | In progress |
|
|||||
445 | Construction of Labour room with 4 bedded Maternity Ward (Assam Type) | Dhubri | NHM/C-CW/Labour Room Cum 4 Bedded Maternity ward /Khopotia /Dhubri/ 2853/ 15/54167 | 16-10-2015 | 25,00,000.00 | -- | Photos |
|
|||||||
446 | Establishment of Health & Wellness Centre at different locations Assam. | Nagaon |